Tag Archives
Completing the hillside challenge
Built on a steep Bristol hillside, the Redland Green School is a striking, innovative and environmentally sensitive educational establishment. When Bristol …
Infill walling provides fast solution
The first phase of the new £23M Caludon Castle School in Coventry has been completed with a quantity of Metsec galvanised steel framing. Used as infill …
Steel takes the honours
Three new steel-framed buildings form the initial stage of the University of Reading’s on-going redevelopment programme. Martin Cooper goes on campus. This …
SSDA 2006 – South East Essex College, Southend-on-Sea
The design concept of the new £40M campus was based on the human body and the building fully demonstrates the flexibility that structural steel can bring to a …
SSDA 2006 – English Institute of Sport, University of Bath
Set up as one of four regional centres of excellence for world-class athletes, the English Institute of Sport is a new elite training facility attached to the …
Open plan for city centre campus
An old Newcastle cinema site is the location for a major campus expansion by the University of Northumbria. Steel construction plays a starring role in the …
Full marks for fossil-shaped school
Caunton Engineering has supplied 95t of steelwork for the construction of an innovative primary school building whose design is inspired by the shape of a …
Sums add up for eco friendly school buildings
Long term maintenance and sustainability were among the key criteria resulting in the selection of steel for two schools that are part of a Derby Private …
A study in steel efficiency
A new landmark taking shape in double quick time on the skyline of Leeds will provide high quality accommodation for almost 1000 students. David Fowler brings …
Steel gives new heart to University campus
Working on a cramped central London university site to the most exacting of tolerances provided a challenge to the entire construction team, Everything was a …











