newsteelconstruction.com
NSC Archives
Search
Subscribe
Archives
This month’s features
Print Friendly, PDF & Email

Tag Archives

History lesson

History lesson

The need to preserve and exhibit Roman remains has dictated the design and configuration of a steel transfer structure that supports a new..

November 14, 2019
The right time for steel

The right time for steel

In the second of our retail and leisure based regeneration projects, Martin Cooper reports from Time Square in Warrington. Warrington is..

April 4, 2019
Steelwork performs complex circus act

Steelwork performs complex circus act

A central London mixed-use development that contains an urban gallery and a basement auditorium is being constructed around a number of..

February 8, 2019
Creating a landmark

Creating a landmark

Using a steel frame solution has helped form the flexible long-span floorplates required for a Manchester city centre commercial..

February 7, 2019
Rebuild, remodel

Rebuild, remodel

One of the first phases of the wider Broadgate redevelopment, the 100 Liverpool Street project will link together two existing buildings..

January 2, 2019
Commendation: Belfast Waterfront Conference & Exhibition Centre

Commendation: Belfast Waterfront Conference & Exhibition Centre

The new steel-framed extension to the Belfast Waterfront provides an additional 7,000m² of floor space, which can facilitate up to 5,000..

October 11, 2018
On the water

On the water

A steel-framed structure, that sits above an east London dock, has benefitted from using a weathering steel base as its all-important..

September 14, 2018
High-rise and column-free

High-rise and column-free

Manchester’s latest commercial development is a 12-storey, column-free London-spec office block at 125 Deansgate. Martin Cooper reports...

September 13, 2018
In the post

In the post

A former Royal Mail sorting office is being reconfigured into a new mixed-use development with large areas of the original steel structure..

March 8, 2018