newsteelconstruction.com
NSC Archives
Search
Subscribe
Archives
Print Friendly, PDF & Email

Tag Archives

Fringe development

Fringe development

Located on the edge of the City of London, a 21-storey commercial building represents Phase 2 of a prestigious Aldgate redevelopment..

July 9, 2019
The right time for steel

The right time for steel

In the second of our retail and leisure based regeneration projects, Martin Cooper reports from Time Square in Warrington. Warrington is..

April 4, 2019
West End addition

West End addition

The latest scheme in London’s ongoing St James’s redevelopment is an eight-storey steel-framed office block which will help to further..

July 12, 2018
Historic chapel reborn as student accommodation

Historic chapel reborn as student accommodation

A steel-framed structure has been erected inside of a Manchester ecclesiastical landmark as part of a restoration and conversion project...

July 14, 2017
Amazon flows into central England

Amazon flows into central England

The centrepiece of a new distribution park is a huge warehouse for the world’s largest online retailer. Distribution centres don’t come..

September 9, 2016
AD 393: Minimum requirements for column splices in accordance with Eurocodes.

AD 393: Minimum requirements for column splices in accordance with Eurocodes.

Clause 6.2.7.1(14) of BS EN 1993-1-8:2005 specifies minimum requirements for component in bearing type splices. The Standard specifies..

January 5, 2016