Tag Archives
Precision engineering for London office block
Computer-driven and time saving fire engineering has resulted in a more cost effective construction programme on one of London’s latest multi-storey office …
SSDA 2006 – The OCS Stand Brit Oval, London
Adding a new visual backdrop to this famous venue, the new 14,500 capacity stand was completed within a tight time scale and opened in time to host one of last …
Landmark shopping centre for historic site
A sloping site, archaeological finds and getting steelwork onto a restricted town centre location were just some of the project’s challenges. Martic Cooper …
New mecca for Glasgow shoppers
Fast track construction, environmental friendliness and in-built flexibility were the must-have’s on the shopping list for the giant Silverburn retail …
More for More London
Two steel framed structures are the latest buildings to be added to the burgeoning More London development. Martin Cooper reports. Standing on Tower Bridge and …
A grand arcade for Wigan
More than 5,000t of steelwork will be supplied by Severfield Reeve Structures for the construction of Wigan’s Grand Arcade shopping centre. Working on behalf …
Severfield-Reeve increases capacity
Severfield-Reeve Structures has invested in a range of new equipment as part of a refurbishment programme at its North Yorkshire plant. The equipment includes …
New industry force
Severfield-Rowen has created a new force in the constructional steelwork sector with the acquisition of Atlas Ward. Severfield-Rowen has agreed with Atlas Ward …
Centrale takes upwards spiral
The most challenging aspect of the car park at the new Croydon Centrale shopping centre was the problem of giving cars access on a constricted site. The design …
Added fibre for faster floors
Polymer fibres are replacing reinforcement in composite floors on a pioneering project in Derby, following a research programme supervised by the SCI. David …