Projects and Features
SSDA 2011 – The Rose Bowl, Southampton
Flanking an existing landmark pavilion, two new stands at the Rose Bowl cricket ground have been designed to be sympathetic to their location as well as …
SSDA 2011 – River Suir Bridge, N25 Waterford Bypass
The new cable-stayed road bridge over the River Suir forms an integral part of the Waterford bypass, and has played a major role in alleviating congestion in …
SSDA 2011 – The St Botolph Building, London
A large modern commercial building in the City of London has utilised steelwork’s flexibility and long span qualities to achieve its uninterrupted floor …
SSDA 2011 – The Hauser Forum, Cambridge
Incorporating a strikingly large cantilever over an adjacent water feature, the Hauser Forum project has used structural steelwork to achieve all of its …
SSDA 2011 – ExCeL Phase 2, Royal Victoria Dock, London
The use of steelwork was paramount for the construction of Phase 2 at London’s ExCeL, where a series of new column free spaces, which can be subdivided as …
Industry know how
Kaltenbach’s International Partners in Steel event in Germany featured a raft of new and upgraded machines for the steel construction industry. This …
Smart building aims for excellence
Forming part of a multi-million pound project, an innovative teaching and workshop centre aimed at supporting low carbon enterprises is making use of a number …
All change at new ticket hall
A steel framed ticket hall is central to Network Rail’s plans for Farringdon Station, which is set to become one of London’s busiest transport hubs. NSC …
Hybrid design for prime location
Occupying a prestigious central London site, Park House will accommodate retail, offices and residential apartments, a combination of uses that required …











