Tag Archives
AWARD: HYLO, London
A total of 13 new steel-framed floors have been added to a 1960s-built office block, resulting in one of the most pioneering tall building retrofit projects in …
More leisure facilities for Cumbria
Structural steelwork has provided an economic framing solution for the £25M redevelopment of Carlisle’s Sands
Hybrid design creates landmark structure
A new steel frame, combined with retained concrete elements, both of which reuse existing foundations, is helping to create an economically-designed commercial …
Award: Bloomberg London
Bloomberg’s new European headquarters achieved a BREEAM ‘Outstanding’ rating, which is the highest design-stage score ever achieved by any major office …
Merit: 101 The Embankment, Salford
Although the original buildings and platforms are long gone, the Grade II listed sandstone façade and viaduct that once supported the long-gone Exchange …
Retail conversion
Installing new steel-framed floorplates into a refurbished 1960s shopping centre is helping to create a contemporary retail and dining quarter. Surrey’s …