Tag Archives
Bridge lift completed in one morning
Shoreditch High Street in east London was closed for one Saturday morning last month to allow a new 38m long steel bowstring bridge to be lifted into position. …
40 Years Ago: A panorama of steel
Taken from Building with Steel, 1968 One dictionary definition of panorama is ‘continuous passing scene’ and this pretty well sums up structural steelwork …
Swansea’s park and ride gets an iconic bridge
The city of Swansea has added an eye-catching bridge structure to its skyline. Known as the Sidings Bridge, it primarily carries an express bus route from an …
Steel wins five categories at prestigious awards
A number of high profile UK steel projects received accolades at the recent Institution of Structural Engineers’ (IStructE) 40th anniversary Structural …
Seven bridges for motorway widening
Rowecord Engineering has fabricated, supplied and erected a total of seven new steel bridges over the M1 motorway, as part of the on-going widening scheme …
40 Years Ago: Attractive new bridge at Windsor
Taken from Building with Steel, 1967 Victoria bridge, which carries the Datchet-Windsor road over the River Thames, was one of a pair constructed about 1851 by …
40 Years Ago: New Flyover at Croydon
Taken from Building with Steel, 1967 The viaduct portion of the new High Street–Old Town flyover in the Greater London Borough of Croydon provides an …
Bridging the missing link
The final £50M stage of the Leeds Inner Ring Road is under way and includes the construction of the dual two-lane 500m-long Hunslet Viaduct. Known locally as …
Weathering steel links to ease congested junction
More than 4,000t of weathering steel will be used for the construction of four new bridges on the busy A2/A282 junction in north Kent, representing one of the …
Environmental title goes to innovative forest walk
An unusual project to create a treetop walk using recycled steel and timber has scooped the Environmental category at the British Construction Industry Awards …











