Tag Archives
Modular construction checks in
A new 198-bedroom hotel in central Glasgow has been constructed in quick time by using offsite steel modular construction technology. Built on the site of the …
Steel projects triumph at industry awards
Glasgow’s New Stobhill Hospital scooped the prestigious Prime Minister’s Better Public Building Award at the British Construction Industry Awards 2010. …
Around the Press – September 2010
Construction News 29 July 2010 Offices get support from strand jacks (Cannon St Station) The solution was to cantilever the floor. However, it is impossible to …
SSDA 2010 – The Riverside Museum, Glasgow
Steel’s flexibility and quality have been highlighted on a challenging design for Glasgow’s new iconic transport museum. One of the most prestigious and …
50 Years Ago: More Distinctive Buildings
From BUILDING WITH STEEL, May
Steel for joined up bridges
Why steel is usually the most suitable material for highway and railway bridges, footbridges and moveable bridges was highlighted at the Steel Bridges …
Steel projects honoured at ACE awards
Steel related projects came out on top in a number of categories at the ACE Engineering Excellence Awards. In the Building Structures (Large Firm) category the …
Launching a viaduct
At 750m long the Port Eglinton Viaduct is the longest bridge on Glasgow’s M74 Completion project. Crossing some of the city’s busiest roads and rail lines, …
Glasgow hospital scoops third award
The new Stobhill Hospital in Glasgow has won the ‘Best Healthcare Building 2009’ at the Glasgow Institute of Architects (GIA) Awards, its third prestigious …
Port Eglinton Viaduct on the move
The largest of four steel structures on Glasgow’s M74 Completion project has begun to be erected by steelwork contractor Cleveland Bridge. Known as the Port …