newsteelconstruction.com

NSC Archives

Tag Archives

Capital scheme

Optimising the number of floors within an overall city centre height limit led the design team to choose a steel-framed solution for Edinburgh’s Capital …

Steel completes at Sheffield’s New Era development

Working on behalf of main contractor Bowmer + Kirkland, Shipley Structures has completed the steelwork erection for the two buildings that constitute phase two …

National Finalists – SSDA 2019

Project Mint at The O2 FACT FILE Architect: CallisonRTKL Structural engineer: BuroHappold Engineering Steelwork contractor: Bourne Steel Ltd Main contractor: …

News in Brief: October 2019

The British Constructional Steelwork Association (BCSA) has announced that Dr David Moore, currently Director of Engineering has accepted the position of Chief …

City benchmark

Open-plan floorplates, a spiralling atrium and landscaped terraces are just some of the features of 80 Fenchurch Street, one of the City’s latest commercial …

Latest Canary Wharf towers taking shape

Steelwork is nearing completion on the two latest high-rise towers in London Docklands. Provisionally known as D1/D2, the largest of the structures is a …

Fringe development

Located on the edge of the City of London, a 21-storey commercial building represents Phase 2 of a prestigious Aldgate redevelopment scheme. Nestled just …

One hundred and out

The second of two commercial buildings sat on a former railway station podium in Salford is quickly taking shape. Martin Cooper reports. The 100 Embankment …

Steelwork performs complex circus act

A central London mixed-use development that contains an urban gallery and a basement auditorium is being constructed around a number of site constraints …

Creating a landmark

Using a steel frame solution has helped form the flexible long-span floorplates required for a Manchester city centre commercial development. Strong levels of …

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives