News
Roof starts to rise on Olympic Stadium
Steelwork for the London 2012 Olympic Stadium is nearing completion since the final section of the roof compression truss was lifted into place during August. …
Gantry for UK’s highest motorway
A steel gantry weighing 55t and measuring more than 50m long has been installed across the east and westbound carriageways of the M62 at Junction 23 to the …
Guidance for Target Zero®
Target Zero, the joint BCSA and Corus initiative aimed at making zero carbon buildings a reality, will publish its first guidance document later this year. The …
Steelwork provides a new home for rare breeds
Phase one of the construction of a new visitor centre and attached animal enclosures at Twycross Zoo in Warwickshire has been completed by a project team …
Bridge opens up redevelopment for Gloucester
The new £10M High Orchard lift bridge, which forms an important route into the massive Gloucester Quays redevelopment scheme has recently opened. Completed by …
Olympic size order for metal flooring
Composite Metal Flooring (CMF) is manufacturing and installing the specialist flooring for the £1.45bn Westfield Stratford City development which is adjacent …
News in Brief – July/August 2009
Cairnhill Structures has taken delivery of a FICEP Close Coupled CNC Sawing and Drilling line, a system which includes high speed carbide drilling. The line …
Cultural centre for west London
Located adjacent to the Grand Union Canal and the A40 Westway flyover, a new cultural hub in west London known as Great Western Studios is set to be fully …
School timetable dictates construction programme
New buildings for Catford High School in south London have been completed, with all building work having been coordinated around the school’s timetable in …










