newsteelconstruction.com

NSC Archives

Tag Archives

Retain and rebuild

FACT FILE1-4 Marble Arch, LondonMain client: Portman EstateArchitect: Allford Hall Monaghan Morris (AHMM)Main contractor: Galliford TryStructural engineer: AKT …

Steel design blossoms at business park

An exposed steel-framed design has given maximum flexibility to the Project Violet scheme, which is providing office space for scientific research and …

History lesson

The need to preserve and exhibit Roman remains has dictated the design and configuration of a steel transfer structure that supports a new student …

The right time for steel

In the second of our retail and leisure based regeneration projects, Martin Cooper reports from Time Square in Warrington. Warrington is perhaps best known for …

Steelwork performs complex circus act

A central London mixed-use development that contains an urban gallery and a basement auditorium is being constructed around a number of site constraints …

Creating a landmark

Using a steel frame solution has helped form the flexible long-span floorplates required for a Manchester city centre commercial development. Strong levels of …

Rebuild, remodel

One of the first phases of the wider Broadgate redevelopment, the 100 Liverpool Street project will link together two existing buildings and add four extra …

Commendation: Belfast Waterfront Conference & Exhibition Centre

The new steel-framed extension to the Belfast Waterfront provides an additional 7,000m² of floor space, which can facilitate up to 5,000 guests. Flexibility …

On the water

A steel-framed structure, that sits above an east London dock, has benefitted from using a weathering steel base as its all-important lowest level. Sat on …

High-rise and column-free

Manchester’s latest commercial development is a 12-storey, column-free London-spec office block at 125 Deansgate. Martin Cooper reports. The twin cities of …

THIS MONTH’S MAGAZINE

Untitled Page

Click on the cover to view this month's issue as a digimag.

Archives