Tag Archives
Bridge installed for Port of Sheerness upgrade
Forming part of Peel Ports’ master plan for its Port of Sheerness, a project which includes a 20-year strategy for growth, Nusteel Structures has fabricated …
Footbridge installed over A55
Working on behalf of main contractor Balfour Beatty Mott MacDonald, Nusteel Structures has installed a 50m-long × 3m-wide cycle/footbridge across the A55/A483 …
Footbridge installed over M20 motorway
A fully assembled single span footbridge weighing 45t has been installed over the M20 in Kent during a night-time closure of the motorway. Fabricated and …
Steel bridge for A228
More than 60t of steelwork has been designed, manufactured and erected by Nusteel Structures for a 55m-long bridge over the A228 in Kent. Nusteel fabricated …