News
Steel frames complete at Trafford Park
Two steel frames with a combined tonnage of 800t have been erected for a flagship Williams Group retail centre for new and approved used vehicles.
Situated on a 14-acre site adjacent to the Trafford Centre, the project includes a striking three-storey contemporary glass fronted showroom for BMW, alongside separate Jaguar Land Rover and Mini showrooms and workshops.
Working on behalf of main contractor Caddick Construction, Border Steelwork Structures has fabricated, supplied and erected the project’s steelwork, and is now installing the cladding.
A further steel-framed structure is due to be erected on-site. Located behind the two showrooms, this 78m-long × 30m-wide portal-framed building will house car wash bays and vehicle valeting areas.