News
Gantry for UK’s highest motorway
A steel gantry weighing 55t and measuring more than 50m long has been installed across the east and westbound carriageways of the M62 at Junction 23 to the …
Guidance for Target Zero®
Target Zero, the joint BCSA and Corus initiative aimed at making zero carbon buildings a reality, will publish its first guidance document later this year. The …
Steelwork provides a new home for rare breeds
Phase one of the construction of a new visitor centre and attached animal enclosures at Twycross Zoo in Warwickshire has been completed by a project team …
Bridge opens up redevelopment for Gloucester
The new £10M High Orchard lift bridge, which forms an important route into the massive Gloucester Quays redevelopment scheme has recently opened. Completed by …
Olympic size order for metal flooring
Composite Metal Flooring (CMF) is manufacturing and installing the specialist flooring for the £1.45bn Westfield Stratford City development which is adjacent …
News in Brief – July/August 2009
Cairnhill Structures has taken delivery of a FICEP Close Coupled CNC Sawing and Drilling line, a system which includes high speed carbide drilling. The line …
Cultural centre for west London
Located adjacent to the Grand Union Canal and the A40 Westway flyover, a new cultural hub in west London known as Great Western Studios is set to be fully …
School timetable dictates construction programme
New buildings for Catford High School in south London have been completed, with all building work having been coordinated around the school’s timetable in …
BCSA lobbies for improved Construction Act
After a number of years of lobbying and campaigning, the changes to the Construction Act contained in Part 8 of the Local Democracy, Economic Development and …









