Tag Archives
Commercial success stories
A steel-framed solution is the tried and tested method for creating high-rise and cost-effective commercial schemes throughout the UK. London has traditionally …
Jamestown’s safety and people strategy
Building on the foundations of a strong performance through 2019, Jamestown continues to invest in both plant and people as it pushes forward into 2020. …
Contract awarded for A19 flyover
Forming part of Highways England’s A19 Testo’s Junction Improvement Scheme, Cleveland Bridge has been awarded the contract to install a new 141.4m-long …
Complex crossing
The successful installation of a five-span bridge across the River Witham in Lincolnshire is testament to the capabilities of the project engineers and the …
Lincolnshire bridge approved by Tees Valley Mayor
Tees Valley Mayor Ben Houchen has given his seal of approval to one of the latest steel structures being manufactured at Cleveland Bridge UK. The Mayor signed …
Historic link restored
For the first time in more than 500 years, the two halves of Tintagel Castle have been reconnected after the installation of a new steel footbridge. Perched on …
Engineers streamline HS2 station roof design
Lead engineers on HS2’s Old Oak Common station, WSP, have revealed a 27% reduction in the structural steel needed for the station roof at the west London …
First British Rail bridge in weathering steel
The first stage of the British Rail Freightliner network was virtually completed in mid-summer 1967 and plans were then prepared for the next stage of the …
Steel hits the right note
Manchester’s Hallé Orchestra is enlarging its St Peter’s rehearsal and recording facility with the construction of a steel-framed extension that will …
Steel benefits from exposure
The attractions of exposing constructional steelwork seem to be growing, as we have been noticing in the increasing number of projects making a virtue of its …