Tag Archives
Steel solution for Welsh viaduct
Forming part of the wider Heads of the Valley scheme, steel construction is playing an integral role in the widening and strengthening of the Taf Fechan …
Record revenues posted by steelwork contractor
Taziker Industrial, the multi-disciplined engineering specialist, has posted record revenues for the financial year to 31st March 2022. Trading in the year was …
Jetties provide haul road access for the viaduct construction, keeping trucks off the road
Temporary steel jetties with a total weight of 5,000t, spanning four lakes, are playing an integral role in the construction of HS2’s Colne Valley
Canopy work completed at Temple Meads station
Network Rail and Taziker Industrial have completed the initial refurbishment programme at Bristol Temple Meads station by repainting the entrance canopies with …
Contract awarded for HS2 temporary works
Steelwork contractor Taziker Industrial has been awarded a contract by VolkerStevin to support the delivery of HS2 on the construction of the Colne Valley …
UK’s tallest rollercoaster gets retracked
In time for Blackpool Pleasure Beach’s reopening on April 12, Taziker Industrial has retracked additional sections of the Big One rollercoaster after …
East Lancashire Railway bridge installed
Steelwork contractor Taziker Industrial has completed a project for Rochdale Borough Council to design, build and install a new footbridge over the East …
Steelwork contractor goes on rollercoaster ride
Taziker Industrial has retracked four sections of the Big One rollercoaster at Blackpool Pleasure Beach as part of the amusement park’s redevelopment …
Tay Bridge refurbishment wins national award
Following a 20-year refurbishment of the Tay Bridge, the UK’s longest railway structure, the work has been recognised as an outstanding achievement and …
Spanning the centuries
English Heritage is undertaking a major conservation programme to repair and conserve the world’s first single span cast iron arch bridge. Spanning the River …