Tag Archives
SSDA 2009: A2/A282 Dartford Improvement Scheme
More than 4,000t of weathering steel was used for the construction of four new bridges on the busy A2/A282 junction in north Kent. Approximately 200,000 …
Viaducts bypass Newry on new A1 link road
Steelwork has been completed on two viaducts which form an integral element of the upgrade of the A1 Belfast to Dublin route. The 200m-long Newry Viaduct …
First link to Olympic Stadium in place
The first of five bridges which will link the Olympic Stadium to the rest of the London 2012 site has been erected by Fairfield Mabey. A 1,000t capacity mobile …
Steel solution for viaduct replacement
To keep vehicles flowing on the A34 near Oxford a temporary bridge will carry traffic while an existing viaduct is demolished and then rebuilt. The deck of …
Bridge lift completed in one morning
Shoreditch High Street in east London was closed for one Saturday morning last month to allow a new 38m long steel bowstring bridge to be lifted into position. …
Steel wins five categories at prestigious awards
A number of high profile UK steel projects received accolades at the recent Institution of Structural Engineers’ (IStructE) 40th anniversary Structural …
SSDA 2007 – Sheppey Crossing, Isle of Sheppey
The construction team of this unobtrusive road bridge successfully dealt with some extremely challenging conditions. The Sheppey Crossing has provided the …
Bridging the missing link
The final £50M stage of the Leeds Inner Ring Road is under way and includes the construction of the dual two-lane 500m-long Hunslet Viaduct. Known locally as …