newsteelconstruction.com

NSC Archives

News

East Manchester regeneration scores twice

Posted on by in News

nManchesterMar14Much of the construction for the first phase of the East Manchester regeneration scheme is nearing full time as two steel framed facilities are due to be completed this summer.

Requiring 700t of structural steelwork, the Connell Sixth Form College and the Beswick Leisure Centre have both been erected by Elland Steel Structures, working on behalf of main contractor Laing O’Rourke.

The college will accommodate 600 students to meet a growing demand for places in this part of Manchester. It will open at the beginning of this year’s autumn academic term.

Beswick Leisure Centre, which is also due to open in September, includes an eight lane swimming pool with a moveable floor, a gym and a dance studio.

Overall the project is a joint regeneration scheme between Manchester City Council and Manchester City Football Club. It will deliver new leisure, education and employment opportunities on a 16 acre adjacent to the football club’s Etihad Campus.

Print Friendly, PDF & Email

Share this post

Related Posts

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives