newsteelconstruction.com

NSC Archives

News

Construction starts on Avonmouth distribution centre

Posted on by in News

More than 1,500t of structural steelwork is being erected for a huge new £20M regional distribution centre for The Co-operative Group in Avonmouth.

Caunton Engineering is carrying out the steelwork fabrication, supply and erection, working on behalf of main contractor Volker Fitzpatrick on a design and supply contract.

The 40,282m² depot is 17m high and measures 280m long × 132m wide, and comprises of 35 × 8m bays with three 44m wide portal spans. The overall structure also includes an energy centre and an operations office block.

Located at Cabot Park, the warehouse will incorporate 16,400m² of cold storage and a 20,560m² racking zone for non perishable goods. When it opens later this year The Co-operative Group will be able to despatch approximately 1.4M cases of food each week to around 450 stores in the south west and South Wales.

Mark Leonard, The Co-operative Group Regional Head of Logistics, said: “The new distribution centre will provide a state of the art facility that will help us provide a first class service to our enlarged store estate.”

The structure will incorporate the highest standards of energy efficiency and is expected to achieve an ‘Excellent’ BREEAM rating.

Share this post

Related Posts

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives