newsteelconstruction.com

NSC Archives

Weekly News

Funding secured for third Snowhill office scheme

Posted on by in Weekly News

snow-hill160324Three Snowhill, one of the largest ever-speculative office projects outside London, has secured funding.

The £90M 39,000m² development in Birmingham city centre will be a steel-framed 14-storey high tower.

Following on from One and Two Snowhill, this is the third steel-framed office structure in the wider development of the area and forms part of Birmingham’s 20-year master plan known as Vision 2030.

Working on behalf of developer Ballymore Properties, BAM Construction is the project’s main contractor. So far no steel contractor has been appointed. Previously, Barrett Steel Buildings and Caunton Engineering erected One and Two Snowhill respectively.

BAM will be remodelling the existing five levels of basement and cores, which serve all three phases, creating office, leisure and conference space and car parking.

The fully curtain walled development is targeting BREEAM ’Excellent’ rating and has an EPC rating of at least B.

Print Friendly, PDF & Email

Share this post

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives