newsteelconstruction.com

NSC Archives

News

Cladding the factory of the future

Posted on by in News

The Advanced Manufactur- ing Research Centre (AMRC) dubbed ‘the Factory of the Fu- ture’ has recently been com- pleted by Bowmer & Kirkland for the University of Sheffield.

The facility houses the lat- est manufacturing equipment and state-of-the-art produc- tion capabilities to enable businesses to trial new devel- opments on a full scale com- mercial production capacity.

The steel framed building, erected by Conder Structures incorporates roofing and clad- ding products manufactured by

Architectural Profiles (APL). The APL Energi System used on the AMRC is based on a StrongBak structural wall framing system which is said to be one of the fastest meth- ods of total building enclosure

and air seal.
The Energi System was

able to achieve a 0.2 w/m2/0c insulation performance against a Buildings Regulations re- quirement of 0.35 and air seal of 2.71m3/hr/m2. Both of these are considered by BREEAM to be in the ‘Excellent’ rating category.

Share this post

Related Posts

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives