newsteelconstruction.com

NSC Archives

News

Additional floors and a retained façade for Knightsbridge development

Posted on by in News

Three adjacent sites at 30-33 Sloane Street, 2-4 Hans Crescent and the ground floor of 49 Pavilion Road are being combined to form a new mixed-use development that sits sensitively within the Knightsbridge conservation area.

Forming the main part of the scheme, the 1920s-built Portland stone façade of 30-33 Sloane Street is being retained, while two additional steel-framed floors have been added to the top, forming a new six-storey building.

Working on behalf of main contractor Galliford Try, Bourne Steel has installed 376t of steelwork for the project.
Aiming to achieve a BREEAM ‘Outstanding’ rating, the scheme will accommodate luxury retail units, offices and a rooftop restaurant with a terrace offering views across central London.

The project, which is due to complete in 2027, is part of the wider regeneration of the area being undertaken by Cadogan Estates.

Share this post

Related Posts

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives