Tag Archives
Steel refit for Tunbridge Wells offices
Located in Tunbridge Wells town centre, the three-storey Heathervale House is being refurbished and extended with the aid of steel construction. The building …
SCI carries out successful fire test on light steel floor
The first industry sponsored fire test on a light steel floor has been carried out by SCI with the floor achieving 90 minutes fire resistance to BS EN 1365. …
Successful fire test on light steel floor
The Steel Construction Institute carried out the first industry sponsored fire test on a light steel floor that achieved 90 minutes fire resistance to the BS …