Tag Archives
Steel prototype building demonstrates sustainable approach
A steel-framed prototype building, being exhibited as part of the London Design Festival, is demonstrating the viability of a circular sustainable economy …
Cast iron challenge
A steelwork contractor’s expertise has been used to re-erect three Listed Victorian cast iron gasholders. Martin Cooper reports. Three cast iron Victorian …
New design guide from Lindapter
Lindapter has launched an updated 76-page product guide for engineers and other professionals involved in the design of structural and secondary steel …
Clamps specified for Forth Crossing
Lindapter Type AAF clamps have been specified for securing the cable management systems along the entire Forth Replacement Crossing. Due to open in 2016, the …
News in Brief: June 2015
The Technology and Innovation Centre (TIC) at the University of Strathclyde is now open for business, with a full programme of conferences scheduled for the …
Design of cold-formed portal frames
David Brown of the SCI discusses some of the issues to be considered when designing portal frames constructed from cold-formed steel. In order to retain the …















