Tag Archives
Construction of the Boyne Bridge
Environmental constraints prevented this very large cable-stayed bridge from being assembled by normal techniques. It had to be put together on one side and …
Heathrow Bridge Travels at Night
On 28 October 2002, a 320-ton steel bridge was moved across the south runway at Heathrow Airport to complete the link between two gate lounges of the £37m …



