newsteelconstruction.com

NSC Archives

Weekly News

Steelwork installation starts on Ferrybridge logistics site

Posted on by in Weekly News

Working on behalf of specialist industrial and logistics developer Mountpark, GMI Construction has started steelwork installation on the former Ferrybridge C Power Station site in West Yorkshire.

Known as Mountpark Ferrybridge, the scheme has secured planning consent for over 150,000m2 of industrial, storage and distribution space.

The first unit to be built is a 6,100m2 distribution facility pre-let to Warburtons, while a second unit, being built speculatively, will provide 3,700m2 of floor space.

Hambleton Steel is fabricating, supplying and erecting the steelwork for the project.

Both buildings are targeting BREEAM ‘Outstanding’ and EPC A/A+ ratings. Sustainability features will include roof-mounted photovoltaic panels, air source heat pumps and electric vehicle charging infrastructure.

Brett Huxley, Development Director UK and Ireland at Mountpark, said: “Seeing real progress at this stage of construction is a key moment for the project.

“The strong momentum on site reflects the continued demand for high-quality, sustainable logistics space in strategically located markets. With steel now in the ground, our vision is rapidly becoming a reality.”

Share this post

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives