newsteelconstruction.com

NSC Archives

Weekly News

Preliminary work starts on Middlesbrough Transporter Bridge restoration

BAM UK & Ireland has been appointed to undertake the next phase of investigations into the restoration of Middlesbrough’s iconic Transporter Bridge, one of only three such structures still surviving in the UK.

The famous steel bridge has been closed since 2019 due to structural and safety concerns. BAM’s preliminary work will begin the process of restoring the historic landmark.

The Grade II* listed bridge, which spans the River Tees between Middlesbrough and Port Clarence, has been a defining feature of the region’s skyline since opening in 1911.

Stretching 260 metres across the river and standing 69 metres tall, the steel structure is recognised as an important achievement in British engineering and a symbol of Teesside’s industrial heritage.

Unlike a conventional bridge, the Transporter uses a suspended gondola to carry vehicles and pedestrians across the river, allowing ships to pass beneath.

Under a 12-month Early Contractor Involvement (ECI) appointment, BAM will undertake detailed testing and trials, working alongside engineering consultants AtkinsRéalis, who are responsible for design work, to develop restoration proposals and associated costs.

Middlesbrough Mayor, Chris Cooke, said: “This is an important next step in what is a huge project. We understand how important the Transporter is to people and we’re determined to do things properly in the face of all the challenges that come with such a complex piece of engineering.”

Share this post

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives