newsteelconstruction.com

NSC Archives

Weekly News

Contract signed for steel diagrid structure in Paddington

Brunel-building151126Laing O’Rourke Construction and Derwent London have signed a fixed price contract for the development of the Brunel Building at 55-65 North Wharf Road, Paddington, London with work due to start early next year for completion in the first half of 2019.

The new steel-framed diagrid Brunel Building will comprise 22,300m² of offices fronting the Grand Union Canal opposite Paddington station.

The Fletcher Priest designed building will have 16-storeys with an innovative external diagrid structure, which will enable column-free internal areas and two large roof terraces on the upper floors.

The building’s entrance will face onto the canal alongside a new public realm, which will be created on the waterside.

Laing O’Rourke Managing Director Paul Sheffield, said: “We look forward to delivering the Brunel Building, further strengthening our partnership with Derwent London.

“The project is one that requires complex engineering, supported by our in-house capabilities along with a fully integrated supply chain.  The exposed high-quality features of this fantastic building will be delivered using a blend of traditional construction and off-site manufacturing.”

Derwent London Director Paul Williams, said: “We are very pleased to be working with Laing O’Rourke, and very excited by the prospects for the Brunel Building. The development not only creates high-quality office space it will also significantly add to the vibrancy of the area, which is enjoying significant regeneration ahead of the opening of Crossrail in 2018.”

Share this post

THIS MONTH'S MAGAZINE

Click on the cover to view this month's issue as a digimag.

Archives