{"id":9834,"date":"2007-09-01T15:40:39","date_gmt":"2007-09-01T15:40:39","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=9834"},"modified":"2012-09-04T15:47:00","modified_gmt":"2012-09-04T15:47:00","slug":"safety-first-for-new-school","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/safety-first-for-new-school\/","title":{"rendered":"Safety first for new school"},"content":{"rendered":"<p><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/09\/Conderschool.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-9835\" title=\"Conderschool\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/09\/Conderschool.jpg\" alt=\"\" width=\"600\" height=\"400\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/09\/Conderschool.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/09\/Conderschool-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<div>\n<div>\n<p>Conder Structures is currently erecting more than 600t of structural steelwork for the \u00a320M PFI financed Portland Community Comprehensive school.<\/p>\n<p>Located in the Nottinghamshire town of Work- sop, the school is E-shaped in plan, with the three arms typically 102m long x 20m wide, while the connected main building measures 97m x 17m.<\/p>\n<\/div>\n<div>\n<p>The structure is predominantly two levels high and will include 112 classrooms, a 36m x 16m assembly hall, an 18m x 32m sports hall and a multpurpose gymna- sium.<\/p>\n<p>During construction Conder has also supplied and installed more than 1,620m of its edge-protection system.<\/p>\n<div>\n<p>Jason Hensman, Conder Managing Director, said: \u201cOur edge protection, supplied in conjunction with SGB, is the preferred solution for these low rise, extended structures and will be in place for 20 weeks of this project before the building is made\u00a0weather tight.\u201d<\/p>\n<p>The project is on schedule for\u00a0handover to the school authori- ties on 26 November 2007.<\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Conder Structures is currently erecting more than 600t of structural steelwork for the \u00a320M PFI financed Portland Community Comprehensive school. Located in the Nottinghamshire town of Work- sop, the school is E-shaped in plan, with the three arms typically 102m long x 20m wide, while the connected main building measures 97m x 17m. The structure [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":9835,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[947,321],"class_list":["post-9834","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-conder-structures","tag-school"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/09\/Conderschool.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-2yC","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/9834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=9834"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/9834\/revisions"}],"predecessor-version":[{"id":9836,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/9834\/revisions\/9836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/9835"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=9834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=9834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=9834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}