{"id":46753,"date":"2026-10-08T14:28:28","date_gmt":"2026-10-08T14:28:28","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=46753"},"modified":"2026-10-08T15:01:12","modified_gmt":"2026-10-08T15:01:12","slug":"award-hill-dickinson-stadium-liverpool","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/award-hill-dickinson-stadium-liverpool\/","title":{"rendered":"AWARD &#8211; Hill Dickinson Stadium, Liverpool"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton1-2610.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"337\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton1-2610.jpg\" alt=\"\" class=\"wp-image-46755\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton1-2610.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton1-2610-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Located on a prominent River Mersey site, within a former Victorian dock, Everton FC\u2019s new 52,769-seat stadium is topped with a sweeping, low-profile cantilevering roof.<\/strong><\/p>\n\n\n\n<p class=\"has-luminous-vivid-amber-background-color has-background wp-block-paragraph\"><strong>FACT FILE<\/strong><br>Architect: BDP Pattern<br>Structural Engineer: Buro Happold<br>Steelwork Contractor: Severfield<br>Main Contractor: Laing O&#8217;Rourke<br>Client: Everton FC \u2018The People\u2019s Project\u2019<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hosting matches since 2025 and built to replace Everton FC\u2019s historic Goodison Park ground, the Hill Dickinson Stadium is the newest venue in the English Premier League.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sat on Liverpool\u2019s waterfront, the new\u00a0<a href=\"https:\/\/steelconstruction.info\/sectors\/leisure-buildings\/#stadia\" target=\"_blank\" rel=\"noopener\">stadium<\/a>\u00a0at Bramley-Moore Dock has reinvigorated a semi-derelict site less than two miles north of the famous Royal Liver Building, while also acting as a catalyst for further regeneration of the area.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This fully accessible venue has been designed with a \u201cFootball First\u201d approach that includes having the seats as close to the pitch as current regulations permit, to enhance the fan experience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To this end, the stadium\u2019s\u00a0design\u00a0incorporates four interlinked <a href=\"https:\/\/steelconstruction.info\/sectors\/leisure-buildings\/#sightlines_and_seating\" target=\"_blank\" rel=\"noopener\">rectangular stands<\/a> (the ground\u2019s four corners are infilled with further seats), which are topped by a continuous <a href=\"https:\/\/steelconstruction.info\/sectors\/leisure-buildings\/#roofing_options_in_stadia\" target=\"_blank\" rel=\"noopener\">cantilevering roof<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The sweeping, low-profile barrel roof, which responds to the industrial character of the surrounding maritime buildings, is said to define the stadium.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Structural steelwork made this geometry possible, creating long, column-free spans over the seating, while maintaining a slender roof profile. Glazed openings at the north and south ends reinforce the roof\u2019s strong east-west orientation and provide views towards the city and river.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton2-2610.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton2-2610.jpg\" alt=\"\" class=\"wp-image-46756\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton2-2610.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton2-2610-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">A series of <a href=\"https:\/\/steelconstruction.info\/sectors\/leisure-buildings\/#trusses\" target=\"_blank\" rel=\"noopener\">steel trusses<\/a> form the roof; above the east and west stands they cantilever for up to 50m. The roofs above the north and south stands are formed by parallel east-west trusses spanning up to 175m.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThe primary trusses are typically 12m-deep and weighed up to 250t when erected,\u201d says Severfield Construction Manager Stephen Osbourne.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cThey are supported at each end with pot bearings located on heavy box <a href=\"https:\/\/steelconstruction.info\/topics\/design\/steel-construction-products\/#standard_open_sections\" target=\"_blank\" rel=\"noopener\">columns<\/a> penetrating through the lower stand steel frame.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Together, these truss elements create a coherent structural response to the barrel-shaped enclosure, providing the strength and <a href=\"https:\/\/steelconstruction.info\/sectors\/leisure-buildings\/#flexibility_and_adaptability\" target=\"_blank\" rel=\"noopener\">flexibility<\/a> required to realise its complex <a href=\"https:\/\/steelconstruction.info\/sectors\/leisure-buildings\/#geometry_and_layout\" target=\"_blank\" rel=\"noopener\">geometry<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The efficient truss depths and high-strength S460 steel reduced the roof\u2019s dead load, while maintaining the required structural performance. Detailed analysis of loading, pre-camber and deflection allowed the steelwork to remain slender despite the substantial spans.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bearings and articulated joints enable the roof ends and fa\u00e7ades to be supported across three separate stand structures, accommodating their interaction without compromising the overall architectural form.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton3-2026.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"337\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton3-2026.jpg\" alt=\"\" class=\"wp-image-46757\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton3-2026.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Award-Everton3-2026-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Efficiency was refined through design development, contractor engagement and detailed assessment of loading requirements. The completed roof structure weighs 130kg\/m\u00b2, including purlins and cladding rails measured across its plan area. Between RIBA Stages 3 and 4, optimisation removed 900t of steel from the roof design, representing an <a href=\"https:\/\/steelconstruction.info\/sectors\/leisure-buildings\/#sustainability_2\" target=\"_blank\" rel=\"noopener\">embodied carbon reduction<\/a> of 2,200tCO\u2082e.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The scale and movement of the roof required the fabrication model to account for both its design geometry and its pre-set position during construction. As each grid line had a different predicted deflection, the steel model was effectively developed twice: first at the final design level and again at the pre-set level required for fabrication and erection. This ensured the roof achieved the intended geometry after deflecting under its own weight.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The north and south roof trusses were pre-assembled and erected in sections up to 60m long, some weighing more than 90t. Complex temporary works and jacking arrangements held each section at its calculated pre-set height before controlled de-jacking allowed the steelwork to move into its permanent position.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The east and west roof structures presented a different erection challenge. Twelve trusses on each side cantilever from the stands, with the barrel form wrapping around the rear of the roof towards the terraces. The cantilevered portions were divided into three pre-assembled lifts, while the curved barrel was erected in smaller sections.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Movement was monitored throughout construction, allowing adjustments to maintain the required accuracy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A dedicated roof assembly area was established on the pitch, using up to ten mobile cranes and 30 mobile elevating work platforms. Pre-assembly transferred work from exposed positions at height to a more controlled environment, improving programme efficiency and supporting safer installation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project\u2019s location threw up further constraints. The river and dock, retained heritage structures and existing infrastructure surrounded the stadium on three sides, limiting access, lifting positions and available workspaces.<br>Construction of the independent stand structures required detailed planning, particularly at the corners where multiple activities converged. Four-dimensional planning coordinated sequencing, plant selection and access while protecting the historic dock walls.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Temporary works were designed as carefully as the permanent steelwork. Approximately 350t of erection trestles were designed for reuse and are now being employed on other projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Meanwhile, the required temporary bracing incorporated reused steel where possible, while 100t of bracing was dismantled in full lengths and returned for future reuse.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In summary, the judges say, built over an historic dock, which was infilled with sand from the adjacent River Mersey, the striking low-profile, barrel form of the roof encloses a stadium with unusually high sustainability credentials. The steel has been very carefully designed and detailed, and its installation painstakingly planned to maximise efficient use of temporary works. A truly first-class stadium. \u25a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Located on a prominent River Mersey site, within a former Victorian dock, Everton FC\u2019s new 52,769-seat stadium is topped with a sweeping, low-profile cantilevering roof. FACT FILEArchitect: BDP PatternStructural Engineer: Buro HappoldSteelwork Contractor: SeverfieldMain Contractor: Laing O&#8217;RourkeClient: Everton FC \u2018The People\u2019s Project\u2019 Hosting matches since 2025 and built to replace Everton FC\u2019s historic Goodison Park [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46754,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[219,4,376,6],"tags":[],"class_list":["post-46753","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-award","category-feature","category-ssda","category-featured"],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-ca5","jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/10\/Slider-Award-Everton-2610.jpg","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46753","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=46753"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46753\/revisions"}],"predecessor-version":[{"id":46758,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46753\/revisions\/46758"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/46754"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=46753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=46753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=46753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}