{"id":46437,"date":"2026-09-03T13:48:17","date_gmt":"2026-09-03T13:48:17","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=46437"},"modified":"2026-09-03T13:48:52","modified_gmt":"2026-09-03T13:48:52","slug":"steel-framed-recycling","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/steel-framed-recycling\/","title":{"rendered":"Steel framed recycling"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK1-2609.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK1-2609.jpg\" alt=\"\" class=\"wp-image-46438\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK1-2609.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK1-2609-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption class=\"wp-element-caption\">A steel-framed option was used for its speed of construction.<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"has-black-color has-cyan-bluish-gray-background-color has-text-color has-background has-link-color wp-elements-1 wp-block-paragraph\"><strong>FACT FILE<br>Wolverton Reuse and Recycling Centre<\/strong><br>Main client: Milton Keynes City Council<br>Architect: TMV Architects<br>Main contractor: Ashe Group<br>Structural engineer: BCAL Consulting<br>Steelwork contractor: HBE Services<br>Steel tonnage: 56t<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Named as England\u2019s top recycling city, Milton Keynes is constructing the first of two new and improved steel-framed reuse and recycling centres that will make it easier for residents to dispose of waste.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Official figures show that in the last year (2024-25) Milton Keynes\u2019 residents dropped 22,300 tonnes of waste and recycling to the city\u2019s recycling centres, making it the top performing city in the country.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Statistics show that 63.2% of the city\u2019s household waste was either recycled, reused or composted. This is impressive, as the national average is 43.8% and just six councils achieved more than 60%.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Recycling saves energy, reduces waste and helps tackle climate change. In Milton Keynes, very little waste goes to landfill and in most months, nothing is sent as the council says it uses material that cannot be recycled to generate electricity, which powers many of its vehicles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Driving sustainability even further, Milton Keynes City Council is currently constructing a new Reuse and Recycling Centre at Wolverton, the first of two planned facilities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cabinet Member for Public Realm, Councillor Jennifer Wilson-Marklew, says: \u201cWe need modern facilities that keep up with demand and give local people a better experience. These centres will be easier to use, more efficient and more sustainable, and we\u2019re investing in this infrastructure now so that Milton Keynes people get the benefits for many years to come.\u201d<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK2-2609.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"800\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK2-2609.jpg\" alt=\"\" class=\"wp-image-46439\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK2-2609.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK2-2609-225x300.jpg 225w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption class=\"wp-element-caption\">HBE Services has laser cut the client&#8217;s name and logo into each of the gantry&#8217;s surrounding balustrades.<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">Designed by TMV Architects, the Wolverton <a href=\"https:\/\/steelconstruction.info\/sectors\/single-storey-industrial-buildings\/\" target=\"_blank\" rel=\"noopener\">facility<\/a> will feature step-free, split-level access, improved signage, and clear separation between public areas and heavy vehicle movements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Structural steelwork is playing an important role, as the important split-level is incorporated into a 70m-long steel-framed canopy that forms the centrepiece of the facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Beneath the canopy, a series of eight 6m-long \u00d7 2m-wide platform gantries are arranged along the length of the structure, creating easy access for customers at the upper level to directly deposit items into containers, which are located on the lower level. Either side of each gantry, there are 6m-wide bays that can accommodate two refuse containers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gaining some support from a retaining wall that creates the two-level plot, the gantries are each supported by four columns, which are concrete encased at the lower level to protect them from any potential vehicle or container impact.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The gantries are formed with two outer beams and a series of cross members, spaced at 1.2m centres, creating a ladder formation. The frame supports a steel mesh flooring system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The gantries and a walkway above the retaining wall (in between each gantry) are surrounded by a protective balustrade, which was fabricated by HBE Services, along with the main steel package.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK3-2609.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"800\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK3-2609.jpg\" alt=\"\" class=\"wp-image-46440\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK3-2609.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK3-2609-225x300.jpg 225w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption class=\"wp-element-caption\">The column&#8217;s lower sections are concrete encased to protect them against vehicle impact.<\/figcaption><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">The supporting columns extend upwards above the gantries floor level, by up to 9m, to support the steel frame\u2019s canopy roof. The completed roof will create a weatherproof environment for the facility\u2019s users, while also ensuring the waste containers do not get filled-up with rainwater during heavy downpours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The canopy roof is pitched by 10 degrees and slopes down towards the lower level side of the steel frame. Taking advantage of the potentially open rooftop space and increasing the site\u2019s sustainability credentials, the roof will support an array of photovoltaic panels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HBE Services has also installed 612m\u00b2 of single-skin cladding to the canopy roof.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The majority of the stability for the steel frame is provided by roof level cross bracings, positioned within each of the 6m-wide bays. Formed from three tubular members (one full length member and two shorter sections), each bracing section was workshop welded prior to being delivered to site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Because the steel frame is entirely outdoor and will be subjected to all types of weather, it has been fully galvanized. The hot-dip galvanizing process not only protects the steelwork against potentially harsh conditions, but also knocks and dents from customers or vehicles that would otherwise go rusty.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK4-2609.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"450\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK4-2609.jpg\" alt=\"\" class=\"wp-image-46441\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK4-2609.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/MK4-2609-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption class=\"wp-element-caption\">Overall, the canopy structure is 70m-long and accommodates eight gantries.<\/figcaption><\/figure>\n<\/div>\n\n\n<h3 class=\"wp-block-heading\">Construction programme<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Due to open this coming October, the entire construction programme for the facility will be completed in just 20 weeks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The site was previously a council-owned service yard and one of the initial tasks for main contractor Ashe Group was to rip up the asphalt and concrete slabs. The company then began some extensive groundworks to create the site\u2019s two levels.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An access route has been created for trucks to enter and leave on the lower level, while above, residents will access the site via their own dedicated entrance. This will lead into a one-way vehicular system, with parking and unloading areas, as well as a zone for the disposal of large electrical and white goods.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">While the groundworks were progressing, a series of pad foundations were installed for the steel columns. The completion of this work allowed the steel erection to start.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Using a single 60t-capacity mobile crane, positioned on the lower level of the site, all of the steelwork was installed in two weeks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">HBE Services\u2019 Contracts Manager Mike Harding, says: \u201cLogistics, planning and coordination played a key role in the successful completion of the steel package.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cWorking from one end of the site to the other, our steel erectors worked and installed the steelwork by following on behind the ground-workers, who were preparing the plot and constructing the retaining wall.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The metalwork (balustrades) was completed in a further two weeks, while the roof cladding was fully installed in just a week.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Summing up, Ashe Group Construction &amp; Technical Director Daniel Armes, says: \u201cI don\u2019t think we could have built the canopy and gantry frame with any other material other than steel, especially not in the timeframe in which this has been fully erected.\u201d <\/p>\n","protected":false},"excerpt":{"rendered":"<p>FACT FILEWolverton Reuse and Recycling CentreMain client: Milton Keynes City CouncilArchitect: TMV ArchitectsMain contractor: Ashe GroupStructural engineer: BCAL ConsultingSteelwork contractor: HBE ServicesSteel tonnage: 56t Named as England\u2019s top recycling city, Milton Keynes is constructing the first of two new and improved steel-framed reuse and recycling centres that will make it easier for residents to dispose [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46442,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[4,6],"tags":[6430,4664,94,2541,763,5694,6431,310,178],"class_list":["post-46437","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-feature","category-featured","tag-ashe-group","tag-bcal-consulting","tag-cladding","tag-cross-bracing","tag-galvanizing","tag-gantries","tag-hbe-consulting","tag-milton-keynes","tag-recycling"],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-c4Z","jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/09\/Slider-MK2609.jpg","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=46437"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46437\/revisions"}],"predecessor-version":[{"id":46443,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46437\/revisions\/46443"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/46442"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=46437"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=46437"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=46437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}