{"id":46316,"date":"2026-08-26T11:11:12","date_gmt":"2026-08-26T11:11:12","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=46316"},"modified":"2026-08-26T11:11:16","modified_gmt":"2026-08-26T11:11:16","slug":"major-transformation-for-crawley-school","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/major-transformation-for-crawley-school\/","title":{"rendered":"Major transformation for Crawley school\u00a0"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/08\/Crawley-school260827e.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/08\/Crawley-school260827e.jpg\" alt=\"\" class=\"wp-image-46317\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/08\/Crawley-school260827e.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/08\/Crawley-school260827e-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Main contractor Bouygues has been awarded the contract for a comprehensive transformation of Holy Trinity CofE Secondary School in Crawley under the Government\u2019s School Rebuilding Programme.&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project encompasses a brand-new 9,300m\u00b2 <a href=\"https:\/\/steelconstruction.info\/sectors\/education-buildings\/\" target=\"_blank\" rel=\"noopener\">school building<\/a>, refurbished facilities and five multi-use Games Areas with works set to commence this month (August).\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The new three-storey school building has been designed around a clear departmental structure that works for the staff and students. Spaces will include a new assembly hall with bleacher seating and a performance lighting rig, a dedicated sixth-form social and study hub, a library resource centre, and specialist facilities including a darkroom, kiln and ceramic studio.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bouygues said it is delivering the project with a strong sustainability specification. The new building will achieve <a href=\"https:\/\/steelconstruction.info\/sectors\/education-buildings\/#breeam_for_schools\" target=\"_blank\" rel=\"noopener\">BREEAM<\/a> \u2018Excellent\u2019 certification, underpinned by roof-mounted solar <a href=\"https:\/\/steelconstruction.info\/sectors\/education-buildings\/#renewable_energy_systems\" target=\"_blank\" rel=\"noopener\">photovoltaic panels<\/a> and a ground-source heat pump.\u00a0\u00a0<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Mark Cesenek, Managing Director, Bouygues UK, said: \u201cHoly Trinity is exactly the kind of project we do best \u2014 complex, phased, delivered on a live site where getting it right for students and staff every single day really matters. We\u2019re proud to be part of something that will serve the Crawley community for generations to come.\u201d\u202f<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Main contractor Bouygues has been awarded the contract for a comprehensive transformation of Holy Trinity CofE Secondary School in Crawley under the Government\u2019s School Rebuilding Programme.&nbsp;&nbsp; The project encompasses a brand-new 9,300m\u00b2 school building, refurbished facilities and five multi-use Games Areas with works set to commence this month (August).\u00a0 The new three-storey school building has [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":46317,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[2396],"tags":[],"class_list":["post-46316","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-weekly-news"],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-c32","jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2026\/08\/Crawley-school260827e.jpg","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46316","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=46316"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46316\/revisions"}],"predecessor-version":[{"id":46318,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/46316\/revisions\/46318"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/46317"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=46316"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=46316"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=46316"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}