{"id":44287,"date":"2025-11-12T12:25:33","date_gmt":"2025-11-12T12:25:33","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=44287"},"modified":"2025-11-14T16:14:23","modified_gmt":"2025-11-14T16:14:23","slug":"winvic-signs-up-for-phase-two-at-liverpools-atlantic-park","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/winvic-signs-up-for-phase-two-at-liverpools-atlantic-park\/","title":{"rendered":"Winvic signs up for phase two at Liverpool\u2019s Atlantic Park"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/11\/Atlantic-Park251113.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"261\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/11\/Atlantic-Park251113.jpg\" alt=\"\" class=\"wp-image-44288\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/11\/Atlantic-Park251113.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/11\/Atlantic-Park251113-300x131.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Having completed the initial four <a href=\"https:\/\/steelconstruction.info\/Single_storey_industrial_buildings\" target=\"_blank\" rel=\"noreferrer noopener\">warehouses<\/a> at Atlantic Park in Bootle, Winvic Construction has been appointed by Royal London Asset Management (RLAM) to construct phase two.<\/p>\n\n\n\n<p>Atlantic Park is a 52-acre site, formerly home to a Rolls-Royce Engineering works, which sits within the Port of Liverpool Freeport zone and will have approximately 243,840m<sup>2<\/sup> of industrial space when complete.<\/p>\n\n\n\n<p>Phase two consists of three more warehouses ranging in size from 16,383m<sup>2<\/sup> up to 65,836m<sup>2<\/sup>, with each unit including <a href=\"https:\/\/steelconstruction.info\/Multi-storey_office_buildings\" target=\"_blank\" rel=\"noreferrer noopener\">two-storey offices<\/a>, service yards and <a href=\"https:\/\/steelconstruction.info\/Car_parks\" target=\"_blank\" rel=\"noreferrer noopener\">car parking<\/a> with EV charging bays.<\/p>\n\n\n\n<p>Winvic is delivering the latest phase as <a href=\"https:\/\/steelconstruction.info\/Operational_carbon#UK_operational_carbon_targets\" target=\"_blank\" rel=\"noreferrer noopener\">net zero carbon<\/a> in construction, employing its <a href=\"https:\/\/www.steelconstruction.info\/Life_cycle_assessment_and_embodied_carbon\" target=\"_blank\" rel=\"noreferrer noopener\">Life Cycle Assessment<\/a> (LCA) process, which is aligned with the <a href=\"https:\/\/www.steelconstruction.info\/Life_cycle_assessment_and_embodied_carbon#RICS_Building_Carbon_Database\" target=\"_blank\" rel=\"noreferrer noopener\">Royal Institution of Chartered Surveyors (RICS) Whole Life Carbon Assessment<\/a>, the <a href=\"https:\/\/steelconstruction.info\/Operational_carbon#UKGBC_Net_zero_carbon_buildings_framework\" target=\"_blank\" rel=\"noreferrer noopener\">UK Green Building Council <\/a>(UKGBC), and the zero carbon network <a href=\"https:\/\/steelconstruction.info\/Operational_carbon#LETI_Climate_emergency_design_guide.5B1.5D\" target=\"_blank\" rel=\"noreferrer noopener\">London Energy Transformation Initiative<\/a> (LETI), as well as being independently third-party verified.<\/p>\n\n\n\n<p>Danny Nelson, Managing Director of Industrial, Distribution and Logistics at Winvic, said: \u201cWe are pleased to be working once again with RLAM to deliver the second phase of this impressive scheme in the North West and are proud to be appointed based on our high-quality delivery in phase one.<\/p>\n\n\n\n<p>\u201cAtlantic Park is bringing in-demand state-of-the-art facilities and supporting regional growth through job creation and training opportunities and Winvic is proud to be the construction partner.\u201d<\/p>\n\n\n\n<p>Matt Barnes, Senior Asset Manager at RLAM, added: \u201cAtlantic Park is a future-ready logistics hub, which is strategically located, <a href=\"https:\/\/steelconstruction.info\/Sustainability\" target=\"_blank\" rel=\"noreferrer noopener\">sustainably<\/a> built, and designed to deliver long-term value.<\/p>\n\n\n\n<p>\u201cThis development is a crucial part of our strategy to deliver high-quality, sustainable assets that support long-term value for our investors.\u201d<\/p>\n\n\n\n<p>Atlantic Park phase two is due to be complete by Summer 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Having completed the initial four warehouses at Atlantic Park in Bootle, Winvic Construction has been appointed by Royal London Asset Management (RLAM) to construct phase two. Atlantic Park is a 52-acre site, formerly home to a Rolls-Royce Engineering works, which sits within the Port of Liverpool Freeport zone and will have approximately 243,840m2 of industrial [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":44288,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[2396],"tags":[],"class_list":["post-44287","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-weekly-news"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/11\/Atlantic-Park251113.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-bwj","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/44287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=44287"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/44287\/revisions"}],"predecessor-version":[{"id":44289,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/44287\/revisions\/44289"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/44288"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=44287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=44287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=44287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}