{"id":42382,"date":"2025-02-26T12:20:36","date_gmt":"2025-02-26T12:20:36","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=42382"},"modified":"2025-02-26T14:54:43","modified_gmt":"2025-02-26T14:54:43","slug":"contract-awarded-for-leeds-bradford-airport-phase-two","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/contract-awarded-for-leeds-bradford-airport-phase-two\/","title":{"rendered":"Contract awarded for Leeds Bradford Airport phase two"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/02\/Leeds-Bradford250227e.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"336\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/02\/Leeds-Bradford250227e.jpg\" alt=\"\" class=\"wp-image-42383\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/02\/Leeds-Bradford250227e.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2025\/02\/Leeds-Bradford250227e-300x168.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Leeds Bradford Airport (LBA) has awarded the contract for phase two of construction works on its \u00a3100 million regeneration project to Farrans Construction, the company which is currently completing phase one.<\/p>\n\n\n\n<p>Phase one, a new three-storey <a href=\"https:\/\/steelconstruction.info\/Leisure_buildings\">terminal<\/a> extension (see <a href=\"https:\/\/www.newsteelconstruction.com\/wp\/set-for-take-off\/\" target=\"_blank\" rel=\"noreferrer noopener\">New Steel Construction Nov\/Dec 2024<\/a>) is due to complete next year, while phase two will see the existing terminal refurbished.<\/p>\n\n\n\n<p>Works will be delivered in multiple sub-phases to minimise disruption to customers and allow the airport to operate as close to normal as possible.<\/p>\n\n\n\n<p>Improvements include the creation of new staircases, lifts and escalators to provide an open plan feel which will complement the new lighter and brighter terminal extension.<\/p>\n\n\n\n<p>Remodelled internal spaces will allow improved passenger movement and there will be brand new security and arrivals facilities, World Duty Free and shops, bars and restaurants.<\/p>\n\n\n\n<p>Vincent Hodder, Chief Executive of LBA, said: \u201cWe\u2019re delighted to be working with Farrans on phase two of our LBA: REGEN project. We\u2019ve already created a strong working relationship with the team and as we transition into the next phase, we\u2019re excited to be able to take our customers along with us on this journey.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Leeds Bradford Airport (LBA) has awarded the contract for phase two of construction works on its \u00a3100 million regeneration project to Farrans Construction, the company which is currently completing phase one. Phase one, a new three-storey terminal extension (see New Steel Construction Nov\/Dec 2024) is due to complete next year, while phase two will see [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[2396],"tags":[],"class_list":["post-42382","post","type-post","status-publish","format-standard","hentry","category-weekly-news"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-b1A","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/42382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=42382"}],"version-history":[{"count":2,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/42382\/revisions"}],"predecessor-version":[{"id":42390,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/42382\/revisions\/42390"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=42382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=42382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=42382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}