{"id":40331,"date":"2024-05-07T16:38:15","date_gmt":"2024-05-07T16:38:15","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=40331"},"modified":"2024-05-07T16:38:17","modified_gmt":"2024-05-07T16:38:17","slug":"new-and-revised-codes-and-standards-from-bsi-updates-april-2024","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/new-and-revised-codes-and-standards-from-bsi-updates-april-2024\/","title":{"rendered":"New and revised codes and standards: From BSI Updates April 2024"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">BRITISH STANDARDS WITHDRAWN<\/h2>\n\n\n\n<p><strong>PD CEN\/TR 15941:2010<\/strong><br>Sustainability of construction works. Environmental product declarations. Methodology for selection and use of generic data.<\/p>\n\n\n\n<p><strong>BS EN ISO 9692-2:1998<\/strong><br>Welding and allied processes. Joint preparation. Submerged arc welding of steels.<br><em>superceded by BS EN ISO 9692-2:2024<\/em><\/p>\n\n\n\n<p><strong>PD CEN ISO\/TR 3834-6:2007<\/strong><br>Quality requirements for fusion welding of metallic materials. Guidelines on implementing ISO 3834.<br><em>superceded by BS EN ISO 3834-6:2024<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">BS EN PUBLICATIONS<\/h2>\n\n\n\n<p><strong>BS EN 15941:2024<\/strong><br>Sustainability of construction works. Data quality for environmental assessment of products and construction work. Selection and use of data.<br><em>supersedes PD CEN\/TR 15941:2010<\/em><\/p>\n\n\n\n<p><strong>BS EN ISO 3834-6:2024<\/strong><br>Quality requirements for fusion welding of metallic materials. Guidelines on implementing the ISO 3834 series.<br><em>supersedes PD CEN ISO\/TR 3834-6:2007<\/em><\/p>\n\n\n\n<p><strong>BS EN ISO 9692-2:2024<\/strong><br>Welding and allied processes. Joint preparation. Submerged arc welding of steels.<br><em>supersedes BS EN ISO 9692-2:1998<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">CEN EUROPEAN STANDARDS<\/h2>\n\n\n\n<p><strong>EN ISO 3834-6:2024<\/strong><br>Quality requirements for fusion welding of metallic materials. Guidelines on implementing ISO 3834 series.<\/p>\n\n\n\n<p><strong>EN ISO 9692-2:2024<\/strong><br>Welding and allied processes. Joint preparation. Submerged arc welding of steels.<\/p>\n\n\n\n<p><strong>EN ISO 15610:2024<\/strong><br>Specification and qualification of welding procedures for metallic materials. Qualification based on tested welding consumables.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">DRAFT BRITISH STANDARDS FOR PUBLIC COMMENT<\/h2>\n\n\n\n<p><strong>24\/30397912 DC<\/strong><br>BS EN 1993-2 Eurocode 3. Design of steel structures. Steel Bridges.<br><em>Comments for the above document are required by 04 June, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30397918 DC<\/strong><br>EN 1993-1-11 Eurocode 3. Design of steel structures. Tension components.<br><em>Comments for the above document are required by 04 June, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30443599 DC<\/strong><br>EN 1993-3 Eurocode 3. Design of steel structures. Towers, masts and chimneys.<br><em>Comments for the above document are required by 04 June, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30457258 DC<\/strong><br>EN 1994-2 Eurocode 4. Design of composite steel and concrete structures. Bridges.<br><em>Comments for the above document are required by 04 June, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30457261 DC<\/strong><br>EN 1994-1-1 Eurocode 4. Design of composite steel and concrete structures. General rules and rules for buildings.<br><em>Comments for the above document are required by 04 June, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30460220 DC<\/strong><br>EN 1994-1-2 Eurocode 4. Design of composite steel and concrete structures. Structural fire design.<br><em>Comments for the above document are required by 04 June, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30459398 DC<\/strong><br>BS EN ISO 15630-3 Steel for the reinforcement and prestressing of concrete. Test methods. Prestressing steel.<br><em>Comments for the above document are required by 20 April, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30467111 DC<\/strong><br>BS EN ISO 16834 Welding consumables. Wire electrodes, wires, rods and deposits for gas shielded arc welding of high strength steels. Classification.<br><em>Comments for the above document are required by 22 April, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30472172 DC<\/strong><br>BS EN ISO 636 Welding consumables. Rods, wires and deposits for tungsten inert gas welding of non-alloy and fine-grain steels. Classification.<br><em>Comments for the above document are required by 13 April, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30482392 DC<\/strong><br>BS EN ISO 17633 Welding consumables. Tubular cored electrodes and rods for gas shielded and non-gas shielded metal arc welding of stainless and heat-resisting steels. Classification.<br><em>Comments for the above document are required by 17 April, 2024<\/em><\/p>\n\n\n\n<p><strong>24\/30483365 DC<\/strong><br>BS EN 10379. Steel sheet piles. Test methods.<br><em>Comments for the above document are required by 30 April, 2024<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">NEW WORK STARTED<\/h2>\n\n\n\n<p><strong>ISO 19998<\/strong><br>Structural bolting coordination. Tasks and responsibilities.<\/p>\n\n\n\n<p><strong>EN ISO 19443<\/strong><br>Quality management systems. Specific requirements for the application of ISO 9001:2015 by organisations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety (ITNS).<\/p>\n\n\n\n<p><strong>EN WI EC103137<\/strong><br>Steels for structural use. General requirements.<\/p>\n\n\n\n<p><strong>ISO 45008<\/strong><br>Occupational health and safety management. Guidelines for remote working.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">BRITISH STANDARDS REVIEWED AND CONFIRMED<\/h2>\n\n\n\n<p><strong>BS EN 14399-7:2018<\/strong><br>High-strength structural bolting assemblies for preloading. System HR. Countersunk head bolt and nut assemblies.<\/p>\n\n\n\n<p><strong>BS EN 14399-8:2018<\/strong><br>High-strength structural bolting assemblies for preloading. System HV. Hexagon fit bolt and nut assemblies.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ISO PUBLICATIONS<\/h2>\n\n\n\n<p><strong>ISO 3834-6:2024<\/strong><br>Quality requirements for fusion welding of metallic materials. Guidelines on implementing the ISO 3834 series.<\/p>\n\n\n\n<p><strong>ISO 9692-2:2024<\/strong><br>Welding and allied processes. Joint preparation. Submerged arc welding of steels.<\/p>\n\n\n\n<p><strong>ISO 19443:2018\/A1:2024<\/strong><br>Quality management systems. Specific requirements for the application of ISO 9001:2015 by organisations in the supply chain of the nuclear energy sector supplying products and services important to nuclear safety (ITNS).<\/p>\n\n\n\n<p><strong>ISO 9001:2015\/A1:2024<\/strong><br>Quality management systems.<\/p>\n\n\n\n<p><strong>ISO 45001:2018\/A1:2024<\/strong><br>Occupational health and safety management systems. Requirements with guidance for use.<\/p>\n\n\n\n<p><strong>ISO 45004:2024<\/strong><br>Occupational health and safety management. Guidelines on performance evaluation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BRITISH STANDARDS WITHDRAWN PD CEN\/TR 15941:2010Sustainability of construction works. Environmental product declarations. Methodology for selection and use of generic data. BS EN ISO 9692-2:1998Welding and allied processes. Joint preparation. Submerged arc welding of steels.superceded by BS EN ISO 9692-2:2024 PD CEN ISO\/TR 3834-6:2007Quality requirements for fusion welding of metallic materials. Guidelines on implementing ISO 3834.superceded [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":32171,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[78,5],"tags":[115],"class_list":["post-40331","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-codes-and-standards","category-tech","tag-codes-and-standards-2"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2021\/01\/CNS21.gif","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-auv","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/40331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=40331"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/40331\/revisions"}],"predecessor-version":[{"id":40332,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/40331\/revisions\/40332"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/32171"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=40331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=40331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=40331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}