{"id":39899,"date":"2024-03-05T16:31:55","date_gmt":"2024-03-05T16:31:55","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=39899"},"modified":"2024-03-05T17:12:02","modified_gmt":"2024-03-05T17:12:02","slug":"steel-connection","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/steel-connection\/","title":{"rendered":"Steel connection"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall1-2403.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"275\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall1-2403.jpg\" alt=\"\" class=\"wp-image-39901\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall1-2403.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall1-2403-300x138.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption class=\"wp-element-caption\">Spanning the River Aire, the bridge will provide an important link between the two parts of the new development.<\/figcaption><\/figure>\n<\/div>\n\n\n<p><strong>A 57m-long Warren Truss pedestrian bridge has been installed to provide a link between two parts of a large residential-led development in Leeds city centre.<\/strong><\/p>\n\n\n\n<p class=\"has-cyan-bluish-gray-background-color has-background\"><strong>FACT FILE<br>Kirkstall Road pedestrian bridge, Leeds<\/strong><br>Main client: Latimer by Clarion Housing Group<br>Main contractor: Beaver Bridges<br>Structural engineer: Beaver Bridges<br>Steelwork contractor: Beaver Bridges<br>Steel tonnage: 60t<\/p>\n\n\n\n<p>Comprising more than 1,700 homes, a new district on the banks of the River Aire is taking shape in Leeds. Being delivered by Latimer, the development arm of the Clarion Housing Group, the scheme will include 11 buildings of eight to 17-storeys, townhouses, <a href=\"https:\/\/steelconstruction.info\/Residential_and_mixed-use_buildings#Student_residences\" target=\"_blank\" rel=\"noreferrer noopener\">accommodation<\/a> for the city\u2019s burgeoning student population and more than 4,000m\u00b2 of commercial space.<\/p>\n\n\n\n<p>Commenting on the development, Richard Cook, Group Development Director at Latimer says: \u201cWe are confident that this development will be a game-changer for the Kirkstall Road corridor and Leeds as a whole, providing a high-quality <a href=\"https:\/\/steelconstruction.info\/Residential_and_mixed-use_buildings#Mixed-use_residential_buildings\" target=\"_blank\" rel=\"noreferrer noopener\">mixed use<\/a>, sustainable community that will attract residents, businesses and visitors. Even more encouraging is the activity we are starting to see in the surrounding areas.\u201d<\/p>\n\n\n\n<p>Sustainability is at the heart of the scheme, as the homes will feature photovoltaic solar panels and will not use fossil fuels. There will be over 1,100 secure cycle parking spaces as well as electric car charging points for residents. New pedestrian walkways and cycle paths will improve local connections \u2013 reducing the site\u2019s carbon footprint and helping to keep cars off the nearby streets.<\/p>\n\n\n\n<p>Nearly half of the 13-acre site\u2019s footprint will be green space, while landscaped areas, including 250 new trees, will be designed to encourage social interaction and communal \u2018grow-your-own\u2019 planting zones.<\/p>\n\n\n\n<p>The scheme will also deliver 2.2 hectares of green infrastructure including a new square, a riverside park and the reinstatement of a<a href=\"https:\/\/steelconstruction.info\/Bridges\" target=\"_blank\" rel=\"noreferrer noopener\"> bridge<\/a> that will create a new north-south route, linking both banks of the River Aire.<\/p>\n\n\n\n<p>Forming an important part of the overall development, the new bridge is a 57m-long <a href=\"https:\/\/steelconstruction.info\/Bridges#Truss_bridges\" target=\"_blank\" rel=\"noreferrer noopener\">Warren Truss<\/a>, designed, fabricated, supplied and installed by Beaver Bridges. Working on a full turnkey build and design contract, the company also installed new abutments and completed the necessary piling.<\/p>\n\n\n\n<p>\u201cThe only convenient position for the new bridge was on the site of the old structure, so our first task was the removal of the existing Bailey bridge and the old and redundant services it carried,\u201d explains Beaver Bridges Head of Sales Clive Evans.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall2-2403.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"377\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall2-2403.jpg\" alt=\"\" class=\"wp-image-39902\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall2-2403.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Kirkstall2-2403-300x189.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption class=\"wp-element-caption\">Lined up and ready to go. The three bridge sections leave Beaver Bridges&#8217; fabrication yard.<\/figcaption><\/figure>\n<\/div>\n\n\n<p>Reinforced concrete abutments were then installed on both sides of the river. These are founded on a series of 300mm-diameter CFA piles, which are up to 11m-deep.<\/p>\n\n\n\n<p>Once the preparatory works had been completed, the new bridge was installed. Manufactured at the company\u2019s Wigan facility, the Warren Truss bridge was <a href=\"https:\/\/www.steelconstruction.info\/Bridges#Construction\" target=\"_blank\" rel=\"noreferrer noopener\">fabricated<\/a> in three sections, which allowed it to be transported to site, where it was spliced together via bolted connections and lifted into place as one complete structure.<\/p>\n\n\n\n<p>Measuring 3.5m-wide, the bridge comprised two 21m-long pieces and one 15m-long central section. Both sides of the Warren Truss have top and bottom chords formed with 250mm x 250mm x 16mm box sections, which are linked together by 200mm x 100mm x 12.5mm diagonal members.<\/p>\n\n\n\n<p>Between the two trusses, the 10mm-thick deck of the bridge is supported by a series of 150mm x 150mm x 6.3mm cross members.<\/p>\n\n\n\n<p>To make sure the three bridge sections fitted together correctly, a trial erection was undertaken at the fabrication yard, before the steelwork was painted.<\/p>\n\n\n\n<p>Using the services of coatings specialist Jack Tighe, the bridge steelwork was painted pillar box red with a <a href=\"https:\/\/www.steelconstruction.info\/Paint_coatings#Main_generic_types_of_paint_and_their_properties\" target=\"_blank\" rel=\"noreferrer noopener\">Fluoropolymer coating<\/a>. This has a 60-year guarantee, minimising any future maintenance and thereby reducing the need for <a href=\"https:\/\/www.steelconstruction.info\/Health_and_safety\" target=\"_blank\" rel=\"noreferrer noopener\">work at height<\/a> and over the river.<\/p>\n\n\n\n<p>As the site is quite confined and surrounded by busy roads, the installation of the bridge was brought about by a co-ordinated three-day operation in conjunction with West Yorkshire Highways.<\/p>\n\n\n\n<p>After the three parts were spliced together, a three-hour lifting operation, using a 1,000t-capacity mobile crane, installed the 60t bridge safely into position.<\/p>\n\n\n\n<p>Beaver Bridges Chief Executive Henry Beaver, says: \u201cWith the ongoing roadworks in the centre of Leeds, it was a challenging location to bring the bridge sections into place for final splicing, but our internal logistics team did an excellent job in managing this on behalf of the client.\u201d<\/p>\n\n\n\n<p>The bridge\u2019s installation is said to be a milestone for the overall development, creating better access to the wider area.<\/p>\n\n\n\n<p>Work on the new development is expected to create around 270 site jobs during each year of the build programme, as well as additional opportunities for young people. Over 100 apprenticeships and work placements are likely to be available throughout construction.<\/p>\n\n\n\n<p>Work on the Kirkstall Road site, which began in 2002, will deliver an estimated \u00a3300M in social value to the city economy. The overall scheme is expected to complete in 2029.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A 57m-long Warren Truss pedestrian bridge has been installed to provide a link between two parts of a large residential-led development in Leeds city centre. FACT FILEKirkstall Road pedestrian bridge, LeedsMain client: Latimer by Clarion Housing GroupMain contractor: Beaver BridgesStructural engineer: Beaver BridgesSteelwork contractor: Beaver BridgesSteel tonnage: 60t Comprising more than 1,700 homes, a new [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39900,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[4,6],"tags":[5660,5659,5661,625,2527,22,3545,5612,171,2618,2443,2070],"class_list":["post-39899","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-feature","category-featured","tag-abutments","tag-beaver-bridges","tag-fluoropolymer-coating","tag-footbridge","tag-jack-tighe","tag-leeds","tag-mobile-crane","tag-off-site-fabrication","tag-prefabrication","tag-transportation-of-steel","tag-trial-erection","tag-warren-truss"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2024\/03\/Slider-Kirkstall-2403.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-anx","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/39899","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=39899"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/39899\/revisions"}],"predecessor-version":[{"id":39903,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/39899\/revisions\/39903"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/39900"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=39899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=39899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=39899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}