{"id":39107,"date":"2023-11-07T11:47:24","date_gmt":"2023-11-07T11:47:24","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=39107"},"modified":"2023-11-07T11:47:26","modified_gmt":"2023-11-07T11:47:26","slug":"work-starts-on-teesworks-carbon-capture-power-station-2","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/work-starts-on-teesworks-carbon-capture-power-station-2\/","title":{"rendered":"Work starts on Teesworks carbon capture power station"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2023\/11\/n1.2-Teesworks2311.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2023\/11\/n1.2-Teesworks2311.jpg\" alt=\"\" class=\"wp-image-39109\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2023\/11\/n1.2-Teesworks2311.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2023\/11\/n1.2-Teesworks2311-300x200.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure>\n<\/div>\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><a href=\"https:\/\/www.steelconstruction.info\/Construction\" data-type=\"link\" data-id=\"https:\/\/www.steelconstruction.info\/Construction\" target=\"_blank\" rel=\"noreferrer noopener\">Construction<\/a> work has begun at the former Redcar steelworks which will become the home to the world-leading Net Zero Teesside Power project.<\/p>\n\n\n\n<p>The preparatory work by Teesworks is underway following the recent signing of an option-for-lease agreement between NZT Power partners bp and Equinor, and Teesworks. The deal could see the multi-billion-pound scheme become an anchor tenant at Teesworks \u2013 the UK\u2019s largest industrial zone.<\/p>\n\n\n\n<p>NZT Power aims to be the world\u2019s first gas-fired power station with carbon capture and storage capability, and will help drive Teesside\u2019s aim to become the UK\u2019s first decarbonised industrial cluster as early as 2030.<\/p>\n\n\n\n<p>The proposed power station will generate up to 860 megawatts of low carbon electricity- enough to power up to 1.3 million UK <a href=\"https:\/\/www.steelconstruction.info\/Residential_and_mixed-use_buildings\" data-type=\"link\" data-id=\"https:\/\/www.steelconstruction.info\/Residential_and_mixed-use_buildings\" target=\"_blank\" rel=\"noreferrer noopener\">homes<\/a>. Up to two million tonnes of CO<sub>2<\/sub> emissions from the power station will be captured each year \u2013 emissions which would otherwise be released into the atmosphere. The captured CO<sub>2<\/sub> will then be transported by the Northern Endurance Partnership by pipeline to a geological storage site under the North Sea, where it will be permanently and safely stored.<\/p>\n\n\n\n<p>Martin Corney, Teesworks CEO, said: \u201cWe\u2019re delighted to take this crucial next step which paves the way for the world-first Net Zero Teesside project, which pioneers the advancement of the globe\u2019s low carbon industries on our doorstep, and help future tenants achieve their own low carbon ambitions.<\/p>\n\n\n\n<p>\u201cNow that all the structures are down, we can get on with the vital remediation work needed to make this project a reality.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction work has begun at the former Redcar steelworks which will become the home to the world-leading Net Zero Teesside Power project. The preparatory work by Teesworks is underway following the recent signing of an option-for-lease agreement between NZT Power partners bp and Equinor, and Teesworks. The deal could see the multi-billion-pound scheme become an [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":39109,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[4080,5527,4483,5528,4137,1952,715],"class_list":["post-39107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-carbon-capture","tag-gas-fired-power-station","tag-net-zero","tag-nzt-power","tag-power-generation","tag-redcar","tag-teeside"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2023\/11\/n1.2-Teesworks2311.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-aaL","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/39107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=39107"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/39107\/revisions"}],"predecessor-version":[{"id":39110,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/39107\/revisions\/39110"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/39109"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=39107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=39107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=39107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}