{"id":36319,"date":"2022-09-06T15:40:32","date_gmt":"2022-09-06T15:40:32","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=36319"},"modified":"2022-09-06T15:40:33","modified_gmt":"2022-09-06T15:40:33","slug":"steel-creates-cyclone","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/steel-creates-cyclone\/","title":{"rendered":"Steel creates Cyclone"},"content":{"rendered":"<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone1-2209.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"800\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone1-2209.jpg\" alt=\"\" class=\"wp-image-36321\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone1-2209.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone1-2209-225x300.jpg 225w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption>Once complete, the flume elements will be added to the steel frame and connected to the adjacent funnel.<\/figcaption><\/figure>\n<\/div>\n\n\n<p><strong>Structural steelwork is playing a leading role in the creation of a new and exciting addition to the available attractions at Center Parcs Whinfell Forest.<\/strong><\/p>\n\n\n\n<p class=\"has-cyan-bluish-gray-background-color has-background\"><strong>FACT FILE<br>Center Parcs Whinfell Forest, Cumbria<\/strong><br>Client: Center Parcs<br>Architect: Holder Mathias Architects<br>Main contractor: SDC Builders<br>Structural engineer: Stantec<br>Steelwork contractor: TSI Structures<br>Steel tonnage: 90t<\/p>\n\n\n\n<p>A 125m-long ride, known as a Tropical Cyclone, where thrill-seekers, sat in inflatable rafts, are transported down a flume that incorporates twists, turns and drops is currently under <a href=\"https:\/\/www.steelconstruction.info\/Construction\" target=\"_blank\" rel=\"noreferrer noopener\">construction<\/a> at Center Parcs Whinfell Forest near Penrith in Cumbria.<\/p>\n\n\n\n<p>This latest attraction is being realised with the aid of steel construction, as the giant flume is supported by a steel tower, that also includes a link bridge to an adjacent Subtropical Swimming Paradise building, as well as areas for the ride\u2019s associated plant equipment.<\/p>\n\n\n\n<p>Including its plant areas, the <a href=\"https:\/\/www.steelconstruction.info\/Braced_frames\" target=\"_blank\" rel=\"noreferrer noopener\">steel-framed<\/a> structure is 14.5m-wide at the base, 10m-wide at the tower and has an overall height of 20m. It is formed with 305UC columns that are connected by a series of 150mm \u00d7 150mm box section cladding rails.<\/p>\n\n\n\n<p>A structural steel frame was the ideal choice for the project as Holder Mathias Architects\u2019 Associate Director David Gallimore explains: \u201cDue to the confined nature of the site, surrounded by trees and areas still occupied by guests and staff, <a href=\"https:\/\/www.steelconstruction.info\/Leisure_buildings#Ease_and_speed_of_construction\" target=\"_blank\" rel=\"noreferrer noopener\">speed<\/a> and <a href=\"https:\/\/www.steelconstruction.info\/Health_and_safety\" target=\"_blank\" rel=\"noreferrer noopener\">safety<\/a> of construction was of paramount importance.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone2-2209.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"800\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone2-2209.jpg\" alt=\"\" class=\"wp-image-36322\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone2-2209.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone2-2209-225x300.jpg 225w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption>The 20m-high tower sits adjacent to an existing swimming pool building and both will be linked via a steel bridge.<\/figcaption><\/figure>\n<\/div>\n\n\n<p>\u201cConsequently, steel has been used for the structure of the envelope above the level of the concrete plant room water tanks. Meanwhile, <a href=\"https:\/\/www.steelconstruction.info\/Metallic_coatings#Hot-dip_galvanizing\" target=\"_blank\" rel=\"noreferrer noopener\">galvanizing<\/a> and organic coatings are necessary to protect the steel from the pool chemicals in the atmosphere and provide the appropriate levels of <a href=\"https:\/\/www.steelconstruction.info\/Structural_fire_resistance_requirements\" target=\"_blank\" rel=\"noreferrer noopener\">fire resistance<\/a>.\u201d<\/p>\n\n\n\n<p>Working on behalf of SDC Builders, TSI Structures <a href=\"https:\/\/www.steelconstruction.info\/Fabrication\" target=\"_blank\" rel=\"noreferrer noopener\">fabricated<\/a> and then supplied the steelwork in small transportable loads before commencing the erection programme.<\/p>\n\n\n\n<p>Due to the restricted nature of the site, the reduced size loads had to be meticulously planned on a just-in-time basis, which also needed to ensure there was no impact to the regular operation of the village or guest experience.<\/p>\n\n\n\n<p>\u201cThe work site is quite confined, while access to the Center Parcs project is predominantly along small and winding roads, which are unsuitable for large trailers,\u201d further explains TSI Technical Director Adrian Betts.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone3-2209.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"390\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone3-2209.jpg\" alt=\"\" class=\"wp-image-36323\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone3-2209.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone3-2209-300x195.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption>Visualisation of the completed ride, sat in its forest setting.<\/figcaption><\/figure>\n<\/div>\n\n\n<p>\u201cThis meant the steelwork had to be <a href=\"https:\/\/www.steelconstruction.info\/Fabrication#Handling_and_transportation\" target=\"_blank\" rel=\"noreferrer noopener\">delivered<\/a> piece-small, including the main 20m-high columns, which were delivered in two pieces and have a bolted splice connection.\u201d<\/p>\n\n\n\n<p>Hand-in-hand with the <a href=\"https:\/\/www.steelconstruction.info\/Construction#Steel_erection\" target=\"_blank\" rel=\"noreferrer noopener\">steel erection<\/a>, suitable lifting locations had to be selected, which removed the need for any over-lifting or oversailing of the surrounding facilities.<\/p>\n\n\n\n<p>\u201cThis facilitated an erection sequence to be developed by the project team that allowed the works to continue safely while the pool was in use,\u201d adds SDC Builders Contracts Manager Mike Hodges.<\/p>\n\n\n\n<p>Another of the main challenges for the onsite erection team was the fact that some of the steelwork was specified to be painted with Sherwin-Williams FIRETEX <a href=\"https:\/\/www.steelconstruction.info\/Fire_protecting_structural_steelwork#Intumescent_Coatings\" target=\"_blank\" rel=\"noreferrer noopener\">intumescent paint<\/a>, while the remainder was coated with a high-gloss finish.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone4-2209.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone4-2209.jpg\" alt=\"\" class=\"wp-image-36324\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone4-2209.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone4-2209-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption>Steelwork model including the link bridge to the swimming pool highlighted in purple.<\/figcaption><\/figure>\n<\/div>\n\n\n<p>All of the painting was done offsite at TSI\u2019s paint shop so, once on site, the steel members, which are duplicated on many parts of the frame, had to be sorted and then erected in the correct sequence.<\/p>\n\n\n\n<p>\u201cBecause of the nature of the structure, only certain parts need to be coated with intumescent fire protection,\u201d adds Mr Betts. \u201cThis included the areas used by customers, such as the <a href=\"https:\/\/www.steelconstruction.info\/Design_of_steel_footbridges\" target=\"_blank\" rel=\"noreferrer noopener\">footbridge<\/a>, staircase, floors and fire escape routes.\u201d<\/p>\n\n\n\n<p>The new steel-framed structure is supported by foundations cast into the top of existing reinforced concrete walls. The steel-frame is structurally-independent and gains its <a href=\"https:\/\/www.steelconstruction.info\/Concept_design#Structural_options_for_stability\" target=\"_blank\" rel=\"noreferrer noopener\">stability<\/a> from cross bracings strategically positioned between the columns. The only location where the new steelwork connects into the adjacent swimming pool building is the link footbridge.<\/p>\n\n\n\n<p>The footbridge is 7m-long \u00d7 4m-wide and is 3.2m-tall. The low-level walkway beams connect to an existing reinforced concrete beam, which is positioned under the floor within the main pool building, while the upper footbridge beams abut the adjoining structure, but do not connect to the swimming pool building.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone5-2209.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"342\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone5-2209.jpg\" alt=\"\" class=\"wp-image-36325\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone5-2209.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/Cyclone5-2209-300x171.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><figcaption>The steel frame is supported by foundations cast into an existing concrete walls.<\/figcaption><\/figure>\n<\/div>\n\n\n<p>\u201cThe steel-framed footbridge has been designed so it can be connected to the existing RC framed swimming pool without breaking through into the pool area,\u201d adds Mr Hodges.<\/p>\n\n\n\n<p>\u201cOnce complete, the actual break-through works will take place behind a sealed construction screen, which will be erected overnight, when the pool is not in use, which will then allow the break-through to continue safely behind it.\u201d<\/p>\n\n\n\n<p>Working alongside the steel erectors, SDC is also assembling the funnel and flume for the ride. Once the steelwork is in place and the <a href=\"https:\/\/www.steelconstruction.info\/Building_envelopes\">clad<\/a><a href=\"https:\/\/www.steelconstruction.info\/Building_envelopes\" target=\"_blank\" rel=\"noreferrer noopener\">din<\/a><a href=\"https:\/\/www.steelconstruction.info\/Building_envelopes\">g<\/a> nearing completion, the final flume element will be installed to the tower and a weathertight seal made around the joint.<\/p>\n\n\n\n<p>Center Parcs Whinfell Forest\u2019s Tropical Cyclone is due to be operational by early 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Structural steelwork is playing a leading role in the creation of a new and exciting addition to the available attractions at Center Parcs Whinfell Forest.<\/p>\n","protected":false},"author":1,"featured_media":36320,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[4,6],"tags":[2086,94,2297,332,3216,1286,767,5080,625,763,862,184,4342,5079,628,5078,4789,2280],"class_list":["post-36319","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-feature","category-featured","tag-centerparcs","tag-cladding","tag-corrosion-protection","tag-cumbria","tag-erection","tag-fabrication","tag-fire-resistance","tag-flume-ride","tag-footbridge","tag-galvanizing","tag-intumescent-coatings","tag-leisure","tag-piece-small-delivery","tag-sdc-builders","tag-staircase","tag-stantec","tag-theme-park","tag-tsi-structures"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2022\/09\/SliderCyclone2209.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-9rN","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/36319","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=36319"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/36319\/revisions"}],"predecessor-version":[{"id":36326,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/36319\/revisions\/36326"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/36320"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=36319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=36319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=36319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}