{"id":3428,"date":"2011-01-01T11:07:03","date_gmt":"2011-01-01T11:07:03","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=3428"},"modified":"2013-10-10T15:56:26","modified_gmt":"2013-10-10T15:56:26","slug":"temporary-volleyball-stadium-for-westminster","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/temporary-volleyball-stadium-for-westminster\/","title":{"rendered":"Temporary volleyball stadium for Westminster"},"content":{"rendered":"<p><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/06\/aTEAM-POPULOUS_Horse-Guards-Parade_2012-Olympic-Beach-Volleyball-Venue-100820_HGP-Final-sml.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-3429\" title=\"aTEAM-POPULOUS_Horse-Guards-Parade_2012-Olympic-Beach-Volleyball-Venue-100820_HGP-Final-sml\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/06\/aTEAM-POPULOUS_Horse-Guards-Parade_2012-Olympic-Beach-Volleyball-Venue-100820_HGP-Final-sml.jpg\" alt=\"\" width=\"600\" height=\"450\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/06\/aTEAM-POPULOUS_Horse-Guards-Parade_2012-Olympic-Beach-Volleyball-Venue-100820_HGP-Final-sml.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/06\/aTEAM-POPULOUS_Horse-Guards-Parade_2012-Olympic-Beach-Volleyball-Venue-100820_HGP-Final-sml-300x225.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/p>\n<p>Plans for a 15,000 seater stadium in Horse Guards Parade to host Olympic beach volleyball have been submitted to Westminster City Council.<\/p>\n<p>The temporary steel framed venue, created by architects Populous and engineering consultancy Atkins, will be dismantled after the Games. It will be erected in the space of six weeks and will be roughly the same size as Wimbledon\u2019s Centre Court.<\/p>\n<p>The arena will consist of two separate parts: an inner or lower bowl, and a three sided upper tier that will offer views of Big Ben and other notable London sights. Adjacent to the venue will be two warm courts, while the stadium will also have floodlights allowing evening competition.<\/p>\n<p>Horse Guards Parade is London\u2019s largest single open space, and was constructed in 1745 to house the King\u2019s personal guards.<\/p>\n<p>Jeff Keas, Principal of Populous said: \u201cWe have designed and will create a sporting arena where you would least expect it in the heart of historic London.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Plans for a 15,000 seater stadium in Horse Guards Parade to host Olympic beach volleyball have been submitted to Westminster City Council. The temporary steel framed venue, created by architects Populous and engineering consultancy Atkins, will be dismantled after the Games. It will be erected in the space of six weeks and will be roughly [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3429,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[75,64,111],"class_list":["post-3428","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-olympics","tag-sport","tag-stadium"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/06\/aTEAM-POPULOUS_Horse-Guards-Parade_2012-Olympic-Beach-Volleyball-Venue-100820_HGP-Final-sml.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-Ti","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/3428","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=3428"}],"version-history":[{"count":3,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/3428\/revisions"}],"predecessor-version":[{"id":8013,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/3428\/revisions\/8013"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/3429"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=3428"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=3428"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=3428"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}