{"id":33299,"date":"2021-06-08T23:36:31","date_gmt":"2021-06-08T23:36:31","guid":{"rendered":"https:\/\/www.newsteelconstruction.com\/wp\/?p=33299"},"modified":"2021-06-08T23:36:35","modified_gmt":"2021-06-08T23:36:35","slug":"work-proceeds-on-enfield-energy-recovery-facility","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/work-proceeds-on-enfield-energy-recovery-facility\/","title":{"rendered":"Work proceeds on Enfield energy recovery facility"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><a href=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2021\/06\/Enfield210610.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"338\" src=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2021\/06\/Enfield210610.jpg\" alt=\"\" class=\"wp-image-33300\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2021\/06\/Enfield210610.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2021\/06\/Enfield210610-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><\/figure><\/div>\n\n\n\n<p>Working on behalf of main contractor Taylor Woodrow, Caunton Engineering is <a href=\"https:\/\/www.steelconstruction.info\/Fabrication\" target=\"_blank\" rel=\"noreferrer noopener\">fabricating<\/a>, supplying and <a href=\"https:\/\/www.steelconstruction.info\/Construction#Steel_erection\" target=\"_blank\" rel=\"noreferrer noopener\">erecting<\/a> the structural steelwork for a major energy recovery facility in north London.<\/p>\n\n\n\n<p>The North London Waste Authority (NLW) is redeveloping the Edmonton EcoPark site in Enfield, within the centrepiece of the works being a facility capable of recycling 700,000 tonnes of residual waste from the seven London boroughs.<\/p>\n\n\n\n<p>Currently, the central part of the site is an Energy from Waste plant, which is nearing the end of its operational life. The project aims to replace this plant with a new and substantially more efficient energy recovery facility, which will generate up to 70MW of electricity, enough to power around 127,000 <a href=\"https:\/\/www.steelconstruction.info\/Residential_and_mixed-use_buildings\" target=\"_blank\" rel=\"noreferrer noopener\">homes<\/a> as well as providing residual heat to a local heat network.<br><br>Julian Gatward, Managing Director of Taylor Woodrow said: \u201cWe are delighted to have been appointed to deliver the EcoPark South Project to contribute towards a more sustainable future for waste in North London.<br><br>&#8220;We are committed to <a href=\"https:\/\/www.steelconstruction.info\/Sustainability\" target=\"_blank\" rel=\"noreferrer noopener\">sustainable<\/a> construction to deliver a world-class facility, which will benefit the local community for years to come.&#8221;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Working on behalf of main contractor Taylor Woodrow, Caunton Engineering is fabricating, supplying and erecting the structural steelwork for a major energy recovery facility in north London. The North London Waste Authority (NLW) is redeveloping the Edmonton EcoPark site in Enfield, within the centrepiece of the works being a facility capable of recycling 700,000 tonnes [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":33300,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[2396],"tags":[],"class_list":["post-33299","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-weekly-news"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2021\/06\/Enfield210610.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-8F5","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/33299","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=33299"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/33299\/revisions"}],"predecessor-version":[{"id":33301,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/33299\/revisions\/33301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/33300"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=33299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=33299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=33299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}