{"id":3174,"date":"2011-02-01T12:41:37","date_gmt":"2011-02-01T12:41:37","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=3174"},"modified":"2012-06-14T14:06:41","modified_gmt":"2012-06-14T14:06:41","slug":"around-the-press-february-2012-2","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/around-the-press-february-2012-2\/","title":{"rendered":"Around the Press \u2013 February 2012"},"content":{"rendered":"<p><strong>Construction News<br \/>\n<\/strong><em>13 January 2011<\/em><strong><em><br \/>\n<\/em><\/strong><strong><span style=\"color: #ff0000;\">Modular steel frame boost for contractors<\/span><br \/>\n<\/strong>Steel specialists using the Corefast prefabricated steel lift core system are now able to manage the entire frame building programme without handing over the vital core construction package to concrete subcontractors.<\/p>\n<p><strong>New Civil Engineer<br \/>\n<\/strong><em>13 January 2011<\/em><strong><em><br \/>\n<\/em><\/strong><strong><span style=\"color: #ff0000;\">All hands on deck<\/span><br \/>\n<\/strong>(Reading Station upgrade) Contractor Bam Nuttall\u2019s project manager Mark Hepburn says that a steel deck was chosen because it cold be designed to be slim enough to clear the road below while maintaining the vertical alignment of the railway.<\/p>\n<p><strong>Construction News<br \/>\n<\/strong><em>13 January 2011<\/em><strong><em><br \/>\n<\/em><span style=\"color: #ff0000;\">Mobile crane drives\u00a0<\/span><span style=\"color: #ff0000;\">M-way link<\/span><br \/>\n<\/strong>Engineers in Scotland have called on the services of one of Europe\u2019s largest mobile cranes to help lift steel bridge sections into place over the River Clyde in Glasgow.<\/p>\n<p><strong>Building Magazine<br \/>\n<\/strong><em>7 January 2011<\/em><strong><em><br \/>\n<\/em><\/strong><strong><span style=\"color: #ff0000;\">Winging it<\/span><br \/>\n<\/strong>(Bombardier factory) \u201cOrdering the steel early to get the building watertight before Christmas was one of the best decisions we made because the weather turned out to be so bad,\u201d says Martin Breheny, project director for Turner &amp; Townsend.<\/p>\n<p><strong>The Guardian<br \/>\n<\/strong><em>16 December 2010<\/em><strong><em><br \/>\n<\/em><\/strong><strong><span style=\"color: #ff0000;\">World Trade Centre reaches halfway mark<\/span><br \/>\n<\/strong>Steel construction has reached the halfway point for the World Trade Center building, also known as the Freedom Tower. After years of stalled development, steel at the building reached the 52nd story, more than 200m above ground.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction News 13 January 2011 Modular steel frame boost for contractors Steel specialists using the Corefast prefabricated steel lift core system are now able to manage the entire frame building programme without handing over the vital core construction package to concrete subcontractors. New Civil Engineer 13 January 2011 All hands on deck (Reading Station upgrade) [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":90,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[548,547,171,541,62,549],"class_list":["post-3174","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bombardier","tag-corefast","tag-prefabrication","tag-reading","tag-transport","tag-world-trade-center-building"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/03\/Press.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-Pc","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/3174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=3174"}],"version-history":[{"count":5,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/3174\/revisions"}],"predecessor-version":[{"id":3178,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/3174\/revisions\/3178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/90"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=3174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=3174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=3174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}