{"id":26465,"date":"2018-06-14T13:30:02","date_gmt":"2018-06-14T13:30:02","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=26465"},"modified":"2018-06-14T13:30:02","modified_gmt":"2018-06-14T13:30:02","slug":"commercial-addition-for-st-jamess-redevelopment","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/commercial-addition-for-st-jamess-redevelopment\/","title":{"rendered":"Commercial addition for St James\u2019s redevelopment"},"content":{"rendered":"<p><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/06\/Dukes-Court_600.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-26466\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/06\/Dukes-Court_600.jpg\" alt=\"\" width=\"600\" height=\"402\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/06\/Dukes-Court_600.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/06\/Dukes-Court_600-300x201.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a>The latest scheme in London\u2019s ongoing St James\u2019s redevelopment is the eight-storey <a href=\"https:\/\/www.steelconstruction.info\/Braced_frames\" target=\"_blank\" rel=\"noopener\">steel-framed<\/a> Duke\u2019s Court <a href=\"https:\/\/www.steelconstruction.info\/Multi-storey_office_buildings\" target=\"_blank\" rel=\"noopener\">office block<\/a> which will help to further enhance the area\u2019s business credentials. <span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n<p>The building will provide 3,234m\u00b2 of office accommodation, spread over six upper floors with two levels of retail offering 1,034m\u00b2 of space.<span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n<p>The building aims to achieve <a href=\"https:\/\/www.steelconstruction.info\/BREEAM\" target=\"_blank\" rel=\"noopener\">BREEAM<\/a> \u2018Outstanding\u2019 for its commercial floors and BREEAM \u2018Very Good\u2019 for its retail zone, while the project as a whole has a WELL standard rating of Gold. The latter certification recognises the building has been designed as a healthy and productive space for its future occupants.<span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n<p>Occupying a footprint of 34m \u00d7 24m, Duke\u2019s Court replaces two old buildings that were demolished prior to main contractor Skanska starting on site.<span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n<p>Bourne Steel is <a href=\"https:\/\/www.steelconstruction.info\/Fabrication\" target=\"_blank\" rel=\"noopener\">fabricating<\/a>, supplying and erecting 600t of steelwork for the project.<span class=\"Apple-converted-space\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The latest scheme in London\u2019s ongoing St James\u2019s redevelopment is the eight-storey steel-framed Duke\u2019s Court office block which will help to further enhance the area\u2019s business credentials. \u00a0 The building will provide 3,234m\u00b2 of office accommodation, spread over six upper floors with two levels of retail offering 1,034m\u00b2 of space.\u00a0 The building aims to achieve [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":26466,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[308,40,138,279,3585,1286,29,324,1354,3586],"class_list":["post-26465","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bourne-steel","tag-breeam","tag-breeam-outstanding","tag-breeam-very-good","tag-dukes-court","tag-fabrication","tag-london","tag-office","tag-skanska","tag-st-jamess"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/06\/Dukes-Court_600.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-6SR","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/26465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=26465"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/26465\/revisions"}],"predecessor-version":[{"id":26469,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/26465\/revisions\/26469"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/26466"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=26465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=26465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=26465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}