{"id":25501,"date":"2018-01-10T11:51:20","date_gmt":"2018-01-10T11:51:20","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=25501"},"modified":"2018-01-10T11:51:20","modified_gmt":"2018-01-10T11:51:20","slug":"phase-three-for-stockport-exchange-announced","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/phase-three-for-stockport-exchange-announced\/","title":{"rendered":"Phase three for Stockport Exchange announced"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-25502\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/01\/Stockport180111.jpg\" alt=\"\" width=\"600\" height=\"414\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/01\/Stockport180111.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/01\/Stockport180111-300x207.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/>Developer Muse has submitted plans for a further phase of the \u00a3145m Stockport Exchange development, following the success of the first two phases.<\/p>\n<p>The regeneration specialist is delivering the mixed-use regeneration scheme in partnership with Stockport Council.<\/p>\n<p>The next phase, Two Stockport Exchange, will see an 18,200m\u00b2 six-storey office built next to the existing <a href=\"https:\/\/www.steelconstruction.info\/Braced_frames\" target=\"_blank\" rel=\"noopener noreferrer\">steel-framed<\/a> office One Stockport Exchange, <a href=\"https:\/\/www.steelconstruction.info\/Construction#Steel_erection\" target=\"_blank\" rel=\"noopener noreferrer\">erected<\/a> by Billington Structures and Eric Wright a year ago.<\/p>\n<p>Outline planning approval is already in place for the Aedas designed scheme, with\u00a0Hannan Associates on board as building services consultant.<\/p>\n<p>Wes Erlam, Development Director at Muse, said: \u201cThe success of Stockport Exchange phase two was phenomenal and the buildings were fully let within just six months of completion, with demand for the <a href=\"https:\/\/www.steelconstruction.info\/Multi-storey_office_buildings\" target=\"_blank\" rel=\"noopener noreferrer\">office building<\/a> being much higher than it was capable of accommodating.<\/p>\n<p>\u201cThis reflects the natural advantages of Stockport as a location for businesses, with exceptional links to London, Manchester, and the motorway network \u2013 alongside ongoing redevelopment of which Stockport Exchange is a part.\u201d<\/p>\n<p>Work is expected to start on site this summer, with completion of phase three anticipated in Spring 2020.<\/p>\n<p>The overall scheme will ultimately deliver up to 114,000m\u00b2 of office space and 8,500m\u00b2 of commercial floor space. The first phase of the scheme \u2013 a 1,000 space <a href=\"https:\/\/www.steelconstruction.info\/Car_parks\" target=\"_blank\" rel=\"noopener noreferrer\">multi-storey car park<\/a> operated by NCP \u2013 was completed in 2014.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Developer Muse has submitted plans for a further phase of the \u00a3145m Stockport Exchange development, following the success of the first two phases. The regeneration specialist is delivering the mixed-use regeneration scheme in partnership with Stockport Council. The next phase, Two Stockport Exchange, will see an 18,200m\u00b2 six-storey office built next to the existing steel-framed [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25502,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[2396],"tags":[],"class_list":["post-25501","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-weekly-news"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2018\/01\/Stockport180111.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-6Dj","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/25501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=25501"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/25501\/revisions"}],"predecessor-version":[{"id":25503,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/25501\/revisions\/25503"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/25502"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=25501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=25501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=25501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}