{"id":23612,"date":"2017-03-08T11:08:19","date_gmt":"2017-03-08T11:08:19","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=23612"},"modified":"2017-03-08T11:08:19","modified_gmt":"2017-03-08T11:08:19","slug":"prestigious-west-end-mixed-use-development-completed","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/prestigious-west-end-mixed-use-development-completed\/","title":{"rendered":"Prestigious West End mixed-use development completed"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-23604\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2017\/03\/Hanover170309.jpg\" alt=\"Hanover170309\" width=\"400\" height=\"506\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2017\/03\/Hanover170309.jpg 400w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2017\/03\/Hanover170309-237x300.jpg 237w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/>Providing 4,500m\u00b2 of office accommodation and 1,400m\u00b2 of retail space, the eight-storey <a href=\"http:\/\/www.steelconstruction.info\/11-12_Hanover_Square,_London\" target=\"_blank\">11-12 Hanover Square<\/a> project in London\u2019s West End has been completed.<\/p>\n<p>Working on behalf of McLaren Construction, BHC <a href=\"http:\/\/www.steelconstruction.info\/Construction#Steel_erection\" target=\"_blank\">erected<\/a> 950t of structural steelwork for the prestigious job that has facades along Oxford Street as well as Hanover Square.<\/p>\n<p>The building\u2019s basement, ground and first floor levels are split in half, with the area nearest Oxford Street dedicated to retail, with the other half of these floors, facing Hanover Square, occupied by a plant room (basement) and a ground floor entrance lobby for the <a href=\"http:\/\/www.steelconstruction.info\/Multi-storey_office_buildings\" target=\"_blank\">offices<\/a>.<\/p>\n<p>From second floor up to seventh floor level, the building is solely commercial office space with the sixth floor benefiting from having a roof garden overlooking Oxford Street offering breakout space for tenants.<\/p>\n<p>McLaren began work on the site during November 2014 with the demolition of the existing buildings. The basement was then deepened and a retaining wall installed along with piled foundations.<\/p>\n<p>The new building has been constructed with a structural <a href=\"http:\/\/www.steelconstruction.info\/Braced_frames\" target=\"_blank\">steel frame<\/a> and <a href=\"http:\/\/www.steelconstruction.info\/Composite_construction#Composite_slabs\" target=\"_blank\">composite concrete floors<\/a>. Steelwork predominantly begins at ground floor, supported by the retaining wall and on concrete piers that extend upwards from the basement slab.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Providing 4,500m\u00b2 of office accommodation and 1,400m\u00b2 of retail space, the eight-storey 11-12 Hanover Square project in London\u2019s West End has been completed. Working on behalf of McLaren Construction, BHC erected 950t of structural steelwork for the prestigious job that has facades along Oxford Street as well as Hanover Square. The building\u2019s basement, ground and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23604,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[2396],"tags":[],"class_list":["post-23612","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-weekly-news"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2017\/03\/Hanover170309.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-68Q","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/23612","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=23612"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/23612\/revisions"}],"predecessor-version":[{"id":23613,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/23612\/revisions\/23613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/23604"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=23612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=23612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=23612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}