{"id":21858,"date":"2016-05-12T12:13:18","date_gmt":"2016-05-12T12:13:18","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=21858"},"modified":"2016-05-12T12:22:03","modified_gmt":"2016-05-12T12:22:03","slug":"contract-awarded-for-rafs-f-35-facilities-2","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/contract-awarded-for-rafs-f-35-facilities-2\/","title":{"rendered":"Contract awarded for RAF\u2019s F-35 facilities"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-21872\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2016\/05\/nRAFMarham1605.jpg\" alt=\"nRAFMarham1605\" width=\"600\" height=\"356\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2016\/05\/nRAFMarham1605.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2016\/05\/nRAFMarham1605-300x178.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/>An \u00a382M contract has been signed between BAE Systems and Balfour Beatty to build aircraft engineering facilities at RAF Marham in Norfolk for the UK\u2019s first F-35 Lightning II fighter jets.<\/p>\n<p>Work is expected to begin at RAF Marham this month, with the project team constructing three facilities to support the operation of the F-35 fleet; a maintenance and finish hangar, a logistics operations centre and an integrated training centre.<\/p>\n<p><a href=\"http:\/\/www.steelconstruction.info\/Construction\" target=\"_blank\">Steel construction<\/a>\u00a0will play a significant role in the works that are scheduled to be completed by early 2018.<\/p>\n<p>Cliff Robson, Senior Vice President &#8211; F-35 Lightning II at BAE Systems Military Air &amp; Information business, said: \u201cThe construction work at RAF Marham signals the start of an exciting time for the BAE Systems and Lockheed Martin team as the UK prepares for the arrival of the first F-35 Lightning II jets.<\/p>\n<p>\u201cThe contract also underlines BAE Systems\u2019 continued involvement with the F-35 Lightning II programme and our company\u2019s credentials in providing infrastructure for the UK\u2019s military aircraft operations. We have a proven pedigree in delivering maintenance and support to the Royal Air Force fast jet fleets at bases throughout the UK, including RAF Marham where we have been supporting the operation of the Tornado GR4 fleet for the last decade.\u201d<\/p>\n<p>Dean Banks, Balfour Beatty managing director UK construction services, said: \u201cWe are committed to making this exciting development a success and extending the excellent track record BAE Systems and Balfour Beatty have for delivering defence projects in the UK.<\/p>\n<p>\u201cOur proven expertise in defence and aviation means that we have developed technically advanced delivery solutions that will help to ensure that RAF Marham\u2019s operational capability is maintained throughout our construction activities on base.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>An \u00a382M contract has been signed between BAE Systems and Balfour Beatty to build aircraft engineering facilities at RAF Marham in Norfolk for the UK\u2019s first F-35 Lightning II fighter jets. Work is expected to begin at RAF Marham this month, with the project team constructing three facilities to support the operation of the F-35 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":21872,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[1018,1179,2691],"class_list":["post-21858","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-balfour-beatty-construction","tag-hangar","tag-raf"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2016\/05\/nRAFMarham1605.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-5Gy","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/21858","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=21858"}],"version-history":[{"count":3,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/21858\/revisions"}],"predecessor-version":[{"id":21874,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/21858\/revisions\/21874"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/21872"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=21858"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=21858"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=21858"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}