{"id":20490,"date":"2015-10-08T00:02:45","date_gmt":"2015-10-08T00:02:45","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=20490"},"modified":"2015-10-08T14:32:29","modified_gmt":"2015-10-08T14:32:29","slug":"fabrication-shop-expansion-for-hambleton-steel","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/fabrication-shop-expansion-for-hambleton-steel\/","title":{"rendered":"Fabrication shop expansion for Hambleton Steel"},"content":{"rendered":"<p><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2015\/09\/Hambleton150924.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-20478\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2015\/09\/Hambleton150924.jpg\" alt=\"Hambleton150924\" width=\"600\" height=\"338\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2015\/09\/Hambleton150924.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2015\/09\/Hambleton150924-300x169.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a>Hambleton Steel says it has increased fabrication efficiency and streamlined material flow after installing a new Voortman integrated process line at its main Rotherham <a href=\"http:\/\/www.steelconstruction.info\/Fabrication\" target=\"_blank\">fabrication<\/a> facility.<\/p>\n<p>Utilising an area in the factory with a lower floor level and formerly used for <a href=\"http:\/\/www.steelconstruction.info\/Paint_coatings#Application_of_paint_coatings\" target=\"_blank\">painting<\/a> and dispatch, the installation required Hambleton to <a href=\"http:\/\/www.steelconstruction.info\/Construction#Steel_erection\" target=\"_blank\">erect<\/a> a new 2m-high steel floor covering 1,500m\u00b2.<\/p>\n<p>\u201cThe new steel frame was fabricated in-house and is supported off the existing slab providing continuity to the main shop floor,\u201d said Hambleton Steel Operations Director Mike Dixon.<\/p>\n<p>The new steelwork consists of 2m-high stub columns and <a href=\"http:\/\/www.steelconstruction.info\/Steel_construction_products#Standard_open_sections\" target=\"_blank\">UB beams<\/a> that are decked using SMD R51 <a href=\"http:\/\/www.steelconstruction.info\/Steel_construction_products#Decking_for_floors\" target=\"_blank\">metal flooring<\/a> and a 200mm thick slab.<\/p>\n<p>The Voortman integrated process line consists of a VSB1500\/4 <a href=\"http:\/\/www.steelconstruction.info\/Fabrication#Shot_blasting\" target=\"_blank\">shot blaster<\/a>, a V630 multi axis drilling and scribing unit and a VB1050 band saw.<\/p>\n<p>All of the machines are in a split system that is linked with fully automated rollers and cross transfer systems allowing multifunctional use.<\/p>\n<p>\u201cBy rejigging our factory and installing the new machines we\u2019ve increased our sawing and <a href=\"http:\/\/www.steelconstruction.info\/Fabrication#Drilling_and_punching\" target=\"_blank\">drilling<\/a> efficiency by up to 40% and decreased our crane <a href=\"http:\/\/www.steelconstruction.info\/Fabrication#Handling_and_transportation\" target=\"_blank\">handling of steelwork<\/a> by 50%,\u201d says Mr Dixon.<\/p>\n<p>In addition to the blast\/drill\/saw line, the company has also procured a V550\/6 punch\/drilling shearing machine to process flats and angles.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hambleton Steel says it has increased fabrication efficiency and streamlined material flow after installing a new Voortman integrated process line at its main Rotherham fabrication facility. Utilising an area in the factory with a lower floor level and formerly used for painting and dispatch, the installation required Hambleton to erect a new 2m-high steel floor [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":20478,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3,2396],"tags":[865,1286,176,2318,847,18],"class_list":["post-20490","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-weekly-news","tag-drilling","tag-fabrication","tag-hambleton-steel","tag-sawing","tag-shotblasting","tag-voortman"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2015\/09\/Hambleton150924.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-5ku","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/20490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=20490"}],"version-history":[{"count":1,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/20490\/revisions"}],"predecessor-version":[{"id":20491,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/20490\/revisions\/20491"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/20478"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=20490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=20490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=20490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}