{"id":18169,"date":"2014-07-15T00:05:09","date_gmt":"2014-07-15T00:05:09","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=18169"},"modified":"2014-07-15T11:57:04","modified_gmt":"2014-07-15T11:57:04","slug":"other-finalist-me-london-hotel-london","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/other-finalist-me-london-hotel-london\/","title":{"rendered":"Other finalist &#8211; ME London Hotel, London"},"content":{"rendered":"<p><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2014\/07\/MEhotelJul14.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-18170\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2014\/07\/MEhotelJul14.jpg\" alt=\"MEhotelJul14\" width=\"600\" height=\"437\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2014\/07\/MEhotelJul14.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2014\/07\/MEhotelJul14-300x218.jpg 300w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/a><span class=\"pqright\"><strong>FACT FILE<\/strong><br \/>\n<strong>Architect:<\/strong> Foster + Partners<br \/>\n<strong>Structural Engineer:<\/strong> Buro Happold Ltd<br \/>\n<strong>Steelwork Contractor:<\/strong> Severfield (UK)<br \/>\n<strong>Main Contractor:<\/strong> Gleeds Management Services Ltd<br \/>\n<strong>Client:<\/strong> Melia Hotels International<\/span>The ME London Hotel is a new five-star hotel and <a href=\"http:\/\/www.steelconstruction.info\/Residential_and_mixed-use_buildings\" target=\"_blank\">residential <\/a>development in Aldwych, central London. It consists of 157 rooms and 86 apartments and incorporates a retained seven-storey <a href=\"http:\/\/www.steelconstruction.info\/Facades_and_interfaces\" target=\"_blank\">fa\u00e7ade<\/a> from Marconi House that previously stood on the site.<\/p>\n<p>The new building is 10 storeys high and is structurally complex in order to achieve the architectural layout and flexibility.<\/p>\n<p>\u201cUsing structural steelwork for the primary frame was the only way of satisfying the required criteria,\u201d says Julian McFarland, Buro Happold Project Engineer.<\/p>\n<p>A nine-storey high central stone clad atrium is the building\u2019s main feature. The structure of the atrium is a load bearing <a href=\"http:\/\/www.steelconstruction.info\/Braced_frames\" target=\"_blank\">braced steel frame<\/a>, a substantial structure that provides stability to the building.<\/p>\n<p>Open plan areas at the lower levels were required for function rooms, a restaurant and bars. However, the floors above needed a frequent <a href=\"http:\/\/www.steelconstruction.info\/Concept_design#Floor_grids\" target=\"_blank\">column grid<\/a> to limit the structural depth and to maximise their ceiling heights.<\/p>\n<p>The conundrum was solved by installing a series of storey high transfer <a href=\"http:\/\/www.steelconstruction.info\/Trusses\" target=\"_blank\">truss<\/a> structures within partition lines between the first and third floors.<\/p>\n<p>\u201cBy using steelwork we were also able to maximise the number of floors within the frame, even inserting an extra floor at the client\u2019s request,\u201d sums up Nick Ling, Foster + Partners Project Architect.<\/p>\n<h3>Judges\u2019 Comment<\/h3>\n<p><em>At the Five-star ME London Hotel on the Aldwych, storey-height steel trusses are used effectively to carry several storeys of bedroom spaces across the long-span public areas needed at the lower levels. The trusses support the regular square grid for the bedroom floors, and have been closely integrated with the distribution of building services.<\/em><\/p>\n<p><em>This prefabricated steel solution is light, and eased construction on this confined city site.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The ME London Hotel is a new five-star hotel and residential development in Aldwych, central London. It consists of 157 rooms and 86 apartments and incorporates a retained seven-storey fa\u00e7ade from Marconi House that previously stood on the site. The new building is 10 storeys high and is structurally complex in order to achieve the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":18269,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[379,376,6],"tags":[65,29,2251,381],"class_list":["post-18169","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-shortlist","category-ssda","category-featured","tag-hotel","tag-london","tag-severfield-uk","tag-ssda-2"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2014\/07\/MEslide.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-4J3","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/18169","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=18169"}],"version-history":[{"count":4,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/18169\/revisions"}],"predecessor-version":[{"id":18244,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/18169\/revisions\/18244"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/18269"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=18169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=18169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=18169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}