{"id":12165,"date":"2006-07-01T16:50:54","date_gmt":"2006-07-01T16:50:54","guid":{"rendered":"http:\/\/www.newsteelconstruction.com\/wp\/?p=12165"},"modified":"2013-07-08T12:01:04","modified_gmt":"2013-07-08T12:01:04","slug":"ssda-2006-mclaren-technology-centre-woking-surrey","status":"publish","type":"post","link":"https:\/\/www.newsteelconstruction.com\/wp\/ssda-2006-mclaren-technology-centre-woking-surrey\/","title":{"rendered":"SSDA 2006 \u2013 McLaren Technology Centre, Woking, Surrey"},"content":{"rendered":"<div id=\"attachment_12166\" style=\"width: 550px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/FP85602@0995-NY-050817-t017.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-12166\" class=\" wp-image-12166 \" title=\"FP85602@0995-NY-050817-t017\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/FP85602@0995-NY-050817-t017.jpg\" alt=\"\" width=\"540\" height=\"261\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/FP85602@0995-NY-050817-t017.jpg 600w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/FP85602@0995-NY-050817-t017-300x145.jpg 300w\" sizes=\"auto, (max-width: 540px) 100vw, 540px\" \/><\/a><p id=\"caption-attachment-12166\" class=\"wp-caption-text\">(Photo: Paul Grundy\/McLaren Group)<\/p><\/div>\n<h4>This temple of engineering excellence is the result of a clear synergy between a strong client and an equally strong architect.<\/h4>\n<h5 class=\"toggle\"><span><\/span>FACT FILE McLaren Technology Centre<\/h5><div class=\"toggle_content\"><p><strong>Architect: <\/strong>Foster and Partners<br \/>\n<strong>Structural Engineer: <\/strong>Arup<br \/>\n<strong>Steelwork Contractor: <\/strong>William Hare<br \/>\n<strong>Main Contractor:\u00a0<\/strong>Kier Build<br \/>\n<strong>Client: <\/strong>McLaren Group<\/p><\/div>\n<p>Situated in leafy Surrey and surrounded by the calming influence of a large lake and 100,000 newly planted trees, the McLaren Technology Centre is the new headquarters for the majority of the Group\u2019s staff.<\/p>\n<p>The Centre boasts design studios, laboratories, research and testing facilities, electronics development, machine shops, and prototyping and production areas for the company\u2019s Formula One cars and the Mercedes-Benz SLR McLaren.<\/p>\n<p>Meanwhile, a visitor centre is located in a separate building at the entrance to the complex. It houses educational facilities, a temporary exhibition space and theatre and is linked to the main Centre by a subterranean building.<\/p>\n<p>Initially, the Centre posed the challenge of sensitively accommodating a building as large as Stansted Airport on a 50-hectare green belt site. The required 60,000m\u00b2\u00a0of accommodation had to be contained within a 20,000m\u00b2\u00a0footprint and a 10m height limitation. This resulted in a deep-plan building sunk into the landscape, shielded from view by trees.<\/p>\n<div id=\"attachment_12167\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/Cover.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-12167\" class=\"size-medium wp-image-12167\" title=\"Cover\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/Cover-300x227.jpg\" alt=\"\" width=\"300\" height=\"227\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/Cover-300x227.jpg 300w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/Cover.jpg 580w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-12167\" class=\"wp-caption-text\">(Photo: Paul Grundy\/McLaren Group)<\/p><\/div>\n<div id=\"attachment_12168\" style=\"width: 310px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/0995-final-NY-040510-d21287.jpg\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-12168\" class=\"size-medium wp-image-12168\" title=\"0995-final-NY-040510-d21287\" src=\"http:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/0995-final-NY-040510-d21287-300x195.jpg\" alt=\"\" width=\"300\" height=\"195\" srcset=\"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/0995-final-NY-040510-d21287-300x195.jpg 300w, https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/0995-final-NY-040510-d21287.jpg 600w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><p id=\"caption-attachment-12168\" class=\"wp-caption-text\">(Photo: Paul Grundy\/McLaren Group)<\/p><\/div>\n<p>An organic design was decided upon which was further shaped by the fact that McLaren International (the Racing division) required more space than the other businesses. The best way to resolve this was to \u2018push\u2019 the glass clad facade forward at that point in the curve, and so create a \u2018ying and yang\u2019 S shape interlocking with the lake in front of the building.<\/p>\n<p>Julie Wood, Arup\u2019s Project Director who had been involved with the project from inception through to completion, says steel was the obvious choice as there was a strong desire to express the structure with an exposed engineering style reflecting the client\u2019s industry.<\/p>\n<p>\u201cSteelwork was also the most practical solution as it allowed prefabrication off-site, which meant the long spans could be provided cost effectively,\u201d she adds.<\/p>\n<p>The main steel elements of the building include all the superstructure columns, beams at first floor and at roof level, while features such as an external curved walkway overlooking the lake and a 7m cantilever at roof level are also made from steel.<\/p>\n<p>\u201cThe brief was to provide a building with a degree of flexibility that would be good value,\u201d says Ms Wood. \u201cPre-formed holes where provided through the structure at regular intervals to allow for services integration and to give future flexibility,\u201d she adds.<\/p>\n<p>One of the most interesting aspects of the project was the fact that Arup designed and produced all the connections before a steelwork contractor even came on-board. \u201cThis was done to assist with the programme and allowed architectural and services requirements to be incorporated at an optimum time,\u201d Ms Wood explains.<\/p>\n<p>A further benefit of this was that the post contract programme had a reduced design and checking time. Standardised beam sizes and sections were specified giving benefits at both the design and construction phases. As all the design information was available from contract award, the steelwork fabricator was able to erect works sequentially from one end of the site to the other.<\/p>\n<p>The judges say they were almost stunned into silence by the calm environment and the quality of the construction, which approaches in relative terms, that of a F.1 racing car.<\/p>\n<p>To conclude the judges say, in some ways this is a disturbing building for human occupation, but it fascinates the intellect and is destined to become a timeless classic.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This temple of engineering excellence is the result of a clear synergy between a strong client and an equally strong architect. Situated in leafy Surrey and surrounded by the calming influence of a large lake and 100,000 newly planted trees, the McLaren Technology Centre is the new headquarters for the majority of the Group\u2019s staff. [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":12166,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[219,376],"tags":[620,594,128,1588],"class_list":["post-12165","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-award","category-ssda","tag-factory","tag-manufacturing","tag-william-hare","tag-woking"],"jetpack_featured_media_url":"https:\/\/www.newsteelconstruction.com\/wp\/wp-content\/uploads\/2012\/10\/FP85602@0995-NY-050817-t017.jpg","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p3WsLP-3ad","_links":{"self":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/12165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/comments?post=12165"}],"version-history":[{"count":4,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/12165\/revisions"}],"predecessor-version":[{"id":17075,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/posts\/12165\/revisions\/17075"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media\/12166"}],"wp:attachment":[{"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/media?parent=12165"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/categories?post=12165"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.newsteelconstruction.com\/wp\/wp-json\/wp\/v2\/tags?post=12165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}