newsteelconstruction.com
NSC Archives
Search
Subscribe
Archives
Print Friendly, PDF & Email

Tag Archives

SSDA 2009: A2/A282 Dartford Improvement Scheme

SSDA 2009: A2/A282 Dartford Improvement Scheme

More than 4,000t of weathering steel was used for the construction of four new bridges on the busy A2/A282 junction in north Kent...

July 1, 2009
Viaducts bypass Newry on new A1 link road

Viaducts bypass Newry on new A1 link road

Steelwork has been completed on two viaducts which form an integral element of the upgrade of the A1 Belfast to Dublin route. The 200m-long..

June 1, 2009
First link to Olympic Stadium in place

First link to Olympic Stadium in place

The first of five bridges which will link the Olympic Stadium to the rest of the London 2012 site has been erected by Fairfield Mabey. A..

May 1, 2009
Steel solution for viaduct replacement

Steel solution for viaduct replacement

To keep vehicles flowing on the A34 near Oxford a temporary bridge will carry traffic while an existing viaduct is demolished and then..

March 1, 2009
Bridge lift completed in one morning

Bridge lift completed in one morning

Shoreditch High Street in east London was closed for one Saturday morning last month to allow a new 38m long steel bowstring bridge to be..

May 1, 2008
Steel wins five categories at prestigious awards

Steel wins five categories at prestigious awards

A number of high profile UK steel projects received accolades at the recent Institution of Structural Engineers’ (IStructE) 40th..

January 1, 2008
Structural steelwork has excellent sustainable credentials

Structural steelwork has excellent sustainable credentials

Steel may be continually recycled without loss of properties and in the UK 94% of steel is reused or recycled. Steel structures have low..

July 1, 2007
SSDA 2007 – Sheppey Crossing, Isle of Sheppey

SSDA 2007 – Sheppey Crossing, Isle of Sheppey

The construction team of this unobtrusive road bridge successfully dealt with some extremely challenging conditions. The Sheppey Crossing..

July 1, 2007
Two more members join charter

Two more members join charter

The Steel Construction Sustainability Charter has recently added two more BCSA members to its list, bringing the total number of companies..

June 1, 2007
Bridging the missing link

Bridging the missing link

The final £50M stage of the Leeds Inner Ring Road is under way and includes the construction of the dual two-lane 500m-long Hunslet..

June 1, 2007